Project Details
This page displays current information for project DEA: 09213404.
Project Information
| Project Identifiers | Project ID: 214135 DEA: 09213404 EFIS: 0900000030 |
|---|---|
| DIST-CO-RTE-PM | 09-INY-395-29.9/41.8 |
| Award Date | 10/22/2021 |
| Closeout Date | Not set |
| Work Description | ROADWAY EXCAVATION, PLACE HMA (TYPE A), AND ALTERNATIVE PIPE CULVERT. |
| Location Description | INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE |
| QA Service Level | 1 (Verified on 05/03/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| kris.raber@nv5.com | Kris Raber | Resident Engineer | Caltrans RE DB |
| sheila.reyes@dot.ca.gov | Sheila Reyes | Structural Representative | Caltrans SR DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1571-1580 of 1627 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-07-12-72 | 07/12/2022 | 07/13/2022 | Quality Control | Concrete | View |
| 2022-07-11-90 | 07/11/2022 | 07/12/2022 | Quality Control | Concrete | View |
| 2022-07-08-107 | 07/08/2022 | 07/11/2022 | Quality Control | Concrete | View |
| 2022-07-07-80 | 07/07/2022 | 07/08/2022 | Quality Control | Concrete | View |
| 2022-07-06-72 | 07/06/2022 | 07/07/2022 | Quality Control | Concrete | View |
| 2022-07-05-43 | 07/05/2022 | 07/06/2022 | Quality Control | Concrete | View |
| 2022-07-01-59 | 07/01/2022 | 07/05/2022 | Quality Control | Concrete | View |
| 2022-06-30-49 | 06/30/2022 | 07/01/2022 | Quality Control | Concrete | View |
| 2022-06-29-49 | 06/29/2022 | 06/30/2022 | Quality Control | Concrete | View |
| 2022-06-28-54 | 06/28/2022 | 06/29/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
