Project Details
This page displays current information for project DEA: 09213404.
Project Information
| Project Identifiers | Project ID: 214135 DEA: 09213404 EFIS: 0900000030 |
|---|---|
| DIST-CO-RTE-PM | 09-INY-395-29.9/41.8 |
| Award Date | 10/22/2021 |
| Closeout Date | Not set |
| Work Description | ROADWAY EXCAVATION, PLACE HMA (TYPE A), AND ALTERNATIVE PIPE CULVERT. |
| Location Description | INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE |
| QA Service Level | 1 (Verified on 05/03/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| kris.raber@nv5.com | Kris Raber | Resident Engineer | Caltrans RE DB |
| sheila.reyes@dot.ca.gov | Sheila Reyes | Structural Representative | Caltrans SR DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1561-1570 of 1627 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-07-26-49 | 07/26/2022 | 07/27/2022 | Quality Control | Concrete | View |
| 2022-07-25-79 | 07/25/2022 | 07/26/2022 | Quality Control | Concrete | View |
| 2022-07-22-63 | 07/22/2022 | 07/25/2022 | Quality Control | Concrete | View |
| 2022-07-21-56 | 07/21/2022 | 07/22/2022 | Quality Control | Concrete | View |
| 2022-07-20-64 | 07/20/2022 | 07/21/2022 | Quality Control | Concrete | View |
| 2022-07-19-84 | 07/19/2022 | 07/20/2022 | Quality Control | Concrete | View |
| 2022-07-18-66 | 07/18/2022 | 07/19/2022 | Quality Control | Concrete | View |
| 2022-07-15-75 | 07/15/2022 | 07/16/2022 | Quality Control | Concrete | View |
| 2022-07-14-90 | 07/14/2022 | 07/15/2022 | Quality Control | Concrete | View |
| 2022-07-13-77 | 07/13/2022 | 07/14/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
