Project Details
This page displays current information for project DEA: 060U8804.
Project Information
| Project Identifiers | Project ID: 994084 DEA: 060U8804 EFIS: 0616000074 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-99-26.3/27.6 |
| Award Date | 01/23/2023 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT A NEW INTERCHANGE AT COMMERCIAL AVENUE NOW CALLED INTERNATIONAL AGRI-CENTER WAY |
| Location Description | ON STATE ROUTE 99 |
| QA Service Level | 1 (Verified on 03/13/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| alberto.lopez@dot.ca.gov | Alberto Lopez | Resident Engineer | Caltrans RE DB |
| vicente.sanchez@dot.ca.gov | Vicente Sanchez | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 141-150 of 659 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-03-03-21 | 03/03/2025 | 03/03/2025 | Quality Assurance | Soil | View |
| 2025-02-25-23 | 02/25/2025 | 02/25/2025 | Quality Assurance | Soil | View |
| 2025-02-25-22 | 02/25/2025 | 02/25/2025 | Quality Assurance | Soil | View |
| 2025-02-24-46 | 02/24/2025 | 02/24/2025 | Quality Assurance | Soil | View |
| 2025-02-24-45 | 02/24/2025 | 02/24/2025 | Quality Assurance | Soil | View |
| 2025-02-24-44 | 02/24/2025 | 02/24/2025 | Quality Assurance | Soil | View |
| 2025-02-11-44 | 02/11/2025 | 02/11/2025 | Quality Assurance | Soil | View |
| 2025-01-31-29 | 01/31/2025 | 02/18/2025 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2025-01-31-28 | 01/31/2025 | 02/18/2025 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2025-02-05-2 | 02/05/2025 | 02/05/2025 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
