Project Details
This page displays current information for project DEA: 07303704.
Project Information
| Project Identifiers | Project ID: 214451 DEA: 07303704 EFIS: 0714000035 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-101-8.0/27.3 |
| Award Date | 12/19/2019 |
| Closeout Date | 05/07/2024 |
| Work Description | REPLACE CONCRETE BARRIERS. |
| Location Description | THE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 08/12/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| kevin.bui@dot.ca.gov | Kevin Bui | Resident Engineer | Caltrans RE DB |
| kwangsuk.suh@dot.ca.gov | Kwangsuk Suh | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 131-140 of 245 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-07-13-4 | 07/13/2022 | 07/13/2022 | Quality Assurance | Soil | View |
| 2022-06-23-58 | 06/23/2022 | 07/05/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2022-06-23-56 | 06/23/2022 | 07/06/2022 | Department Acceptance | Asphalt Binder | View |
| 2022-07-07-28 | 07/07/2022 | 07/07/2022 | Quality Assurance | Soil | View |
| 2022-06-30-22 | 06/30/2022 | 07/01/2022 | Department Acceptance | Concrete | View |
| 2022-07-05-10 | 07/05/2022 | 07/07/2022 | Department Acceptance | Aggregate | View |
| 2022-07-05-9 | 07/05/2022 | 07/07/2022 | Department Acceptance | Aggregate | View |
| 2022-07-05-8 | 07/05/2022 | 07/07/2022 | Department Acceptance | Aggregate | View |
| 2022-06-24-35 | 06/24/2022 | 06/25/2022 | Department Acceptance | Concrete | View |
| 2022-07-01-10 | 07/01/2022 | 07/01/2022 | Department Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
