Project Details
This page displays current information for project DEA: 07215954.
Project Information
| Project Identifiers | Project ID: 209141 DEA: 07215954 EFIS: 0700001835 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-0.0/7.6 |
| Award Date | 04/24/2014 |
| Closeout Date | 07/14/2022 |
| Work Description | WIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES |
| Location Description | LOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605 |
| QA Service Level | 1 (Verified on 06/02/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| thang.ton@dot.ca.gov | Thang Ton | Resident Engineer | Caltrans RE DB |
| amare.tsegie@dot.ca.gov | Amare Tsagie | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 131-140 of 1392 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2019-05-09-17 | 05/09/2019 | 05/10/2019 | Quality Control | Concrete | View |
| 2019-05-09-16 | 05/09/2019 | 05/10/2019 | Quality Control | Aggregate | View |
| 2019-05-08-30 | 05/08/2019 | 05/09/2019 | Quality Control | Concrete | View |
| 2019-05-08-29 | 05/08/2019 | 05/09/2019 | Quality Control | Aggregate | View |
| 2019-05-08-28 | 05/08/2019 | 05/09/2019 | Quality Control | Concrete | View |
| 2019-05-08-27 | 05/08/2019 | 05/09/2019 | Quality Control | Aggregate | View |
| 2019-07-20-3 | 07/20/2019 | 07/24/2019 | Verification | Aggregate | View |
| 2019-05-08-24 | 05/08/2019 | 05/09/2019 | Quality Control | Concrete | View |
| 2019-05-08-23 | 05/08/2019 | 05/09/2019 | Quality Control | Aggregate | View |
| 2019-05-06-12 | 05/06/2019 | 05/07/2019 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
