Project Details
This page displays current information for project DEA: 081J7204.
Project Information
| Project Identifiers | Project ID: 1000681 DEA: 081J7204 EFIS: 0818000099 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-40-S0.0/S0.8,0.0/R15.0 |
| Award Date | 01/17/2025 |
| Closeout Date | 09/03/2026 |
| Work Description | REPLACE AC SURFACING, COLD PLANE AC PAVEMENT, HMA, RSP, AND MGS. |
| Location Description | SAN BERNARDINO COUNTY IN AND NEAR BARSTOW FROM 0.1 MILE WEST OF ROBERTA STREET TO MONTARA ROAD AND FROM ROUTE 15 TO 0.4 MILE EAST OF LAVA WASH BRIDGE |
| QA Service Level | 1 (Verified on 01/13/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| khoa.n.nguyen@dot.ca.gov | Khoa Nguyen | Resident Engineer | Caltrans RE DB |
| prakash.gowda@dot.ca.gov | Prakash Gowda | District Materials Engineer - Field Lab Fontana | Caltrans District Materials Engineer |
| zihui.li@dot.ca.gov | Zihui Li | District Materials Engineer - SRL PCC/Agg/Soils Lab | Caltrans District Materials Engineer |
| cristina.paredes@dot.ca.gov | Cristina Paredes | District Materials Engineer - SRL HMA and Binder Labs | Caltrans District Materials Engineer |
| sittampalam.sathiskumar@dot.ca.gov | Sittampalam Sathiskumar | District Materials Engineer - Design | Caltrans District Materials Engineer |
| kaushalkumar.talati@dot.ca.gov | Kaushalkumar Talati | District Materials Engineer - Field Lab Barstow and Hesperia | Caltrans District Materials Engineer |
| brian.teh@dot.ca.gov | Brian Teh | District Materials Engineer - SRL STS and Field Lab Blythe | Caltrans District Materials Engineer |
Samples
Samples submitted for this project.
Displaying 131-140 of 236 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-06-11-38 | 06/11/2025 | 06/13/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-09-46 | 06/09/2025 | 06/11/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-06-15 | 06/06/2025 | 06/09/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-05-17 | 06/05/2025 | 06/06/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-04-21 | 06/04/2025 | 06/05/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-03-37 | 06/03/2025 | 06/04/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-05-21-80 | 05/21/2025 | 05/22/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-05-20-77 | 05/20/2025 | 05/22/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-05-15-63 | 05/15/2025 | 05/22/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-05-29-47 | 05/29/2025 | 05/29/2025 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
