Project Details
This page displays current information for project DEA: 044G0804.
Project Information
| Project Identifiers | Project ID: 215677 DEA: 044G0804 EFIS: 0412000332 COOP: 042676 |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-80-R10.4/30.2 |
| Award Date | 01/18/2022 |
| Closeout Date | Not set |
| Work Description | Highway widening, overhead signs, and electronic toll system. |
| Location Description | In Solano County in Fairfield and Vacaville from 1.0 mile west of Red Top Road Undercrossing to 0.4 mile east of Leisure Town Road Overcrossing. |
| QA Service Level | 1 (Verified on 04/11/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| justen.tatum@dot.ca.gov | Justen Tatum | Resident Engineer | Caltrans RE DB |
| Justen.Tatum@dot.ca.gov | Justen Tatum | Oversight Resident Engineer | Caltrans REO DB |
| kelsey.littell@dot.ca.gov | Kelsey Littell | Structural Representative | Caltrans SR DB |
| dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1361-1370 of 1968 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-07-05-71 | 07/05/2023 | 07/13/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-07-06-72 | 07/06/2023 | 07/11/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-06-08-77 | 06/08/2023 | 06/09/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-06-08-76 | 06/08/2023 | 06/09/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-06-09-56 | 06/09/2023 | 06/13/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-06-07-90 | 06/07/2023 | 06/08/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-07-05-70 | 07/05/2023 | 06/29/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-06-27-114 | 06/27/2023 | 06/29/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-05-30-64 | 05/30/2023 | 05/31/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-06-27-113 | 06/27/2023 | 06/28/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
