Project Details
This page displays current information for project DEA: 042640U4.
Project Information
| Project Identifiers | Project ID: 7463 DEA: 042640U4 EFIS: 0412000195 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-101-0.9/3.6 |
| Award Date | 11/02/2012 |
| Closeout Date | 06/03/2020 |
| Work Description | CONSTRUCT PETALUMA BLVD SOUTH INTERCHANGE, REPLACE PETALUMA RIVER BR |
| Location Description | SONOMA COUNTY IN AND NEAR PETALUMA FROM GUNN DRIVE TO ROUTE 101/116 SEPARATION AND OVERHEAD |
| QA Service Level | 1 (Verified on 09/11/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| richard.duncan@dot.ca.gov | Richard Duncan | Resident Engineer | Caltrans RE DB |
| brian.f.beaudoin@dot.ca.gov | Brian Beaudoin | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 121-130 of 139 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2014-09-11-4 | 09/11/2014 | 09/22/2014 | Verification | Concrete | View |
| 2014-09-19-2 | 09/19/2014 | 09/22/2014 | Verification | Concrete | View |
| 2014-09-09-4 | 09/09/2014 | 09/12/2014 | Quality Control | Concrete | View |
| 2014-08-18-1 | 08/18/2014 | 08/22/2014 | Quality Control | Concrete | View |
| 2014-08-19-5 | 08/19/2014 | 08/22/2014 | Quality Control | Concrete | View |
| 2014-08-20-17 | 08/20/2014 | 08/22/2014 | Quality Control | Concrete | View |
| 2014-08-07-1 | 08/07/2014 | 08/15/2014 | Verification | Concrete | View |
| 2014-02-26-11253754 | 02/26/2014 | 02/07/2014 | Annual Source Testing | Aggregate | View |
| 2014-02-26-11219078 | 02/26/2014 | 02/07/2014 | Annual Source Testing | Aggregate | View |
| 2014-02-26-11168394 | 02/26/2014 | 02/07/2014 | Annual Source Testing | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
