Project Details
This page displays current information for project DEA: 100V4804.
Project Information
| Project Identifiers | Project ID: 1000272 DEA: 100V4804 EFIS: 1013000264 |
|---|---|
| DIST-CO-RTE-PM | 10-CAL-26-21.8/30.3 |
| Award Date | 09/09/2024 |
| Closeout Date | Not set |
| Work Description | SLOPE STABILIZATION AND CONSTRUCT RETAINING WALL. |
| Location Description | CALAVERAS COUNTY NEAR MOKELUMNE HILL AT VARIOUS LOCATIONS FROM 3.6 MILES EAST OF ROUTE 49 TO 0.9 MILE WEST OF WOODHOUSE MINE ROAD |
| QA Service Level | 1 (Verified on 04/15/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| jonathan.ngai@dot.ca.gov | Jonathan Ngai | Resident Engineer | Caltrans RE DB |
| Conor.Hennessy@dot.ca.gov | Conor Hennessy | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 121-130 of 138 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-04-30-10 | 04/30/2025 | 04/30/2025 | Quality Control | Concrete | View |
| 2025-04-29-22 | 04/29/2025 | 04/29/2025 | Quality Control | Concrete | View |
| 2025-04-28-26 | 04/28/2025 | 04/28/2025 | Quality Control | Concrete | View |
| 2025-04-25-12 | 04/25/2025 | 04/25/2025 | Quality Control | Concrete | View |
| 2025-04-24-3 | 04/24/2025 | 04/24/2025 | Quality Control | Concrete | View |
| 2025-04-23-5 | 04/23/2025 | 04/23/2025 | Quality Control | Concrete | View |
| 2025-04-22-16 | 04/22/2025 | 04/22/2025 | Quality Control | Concrete | View |
| 2025-04-21-8 | 04/21/2025 | 04/21/2025 | Quality Control | Concrete | View |
| 2025-04-18-8 | 04/18/2025 | 04/18/2025 | Quality Control | Concrete | View |
| 2025-04-17-2 | 04/17/2025 | 04/17/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
