Project Details
This page displays current information for project DEA: 041J5694.
Project Information
| Project Identifiers | Project ID: 214601 DEA: 041J5694 EFIS: 0419000313 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-101-0.0/21.8 |
| Award Date | 12/03/2019 |
| Closeout Date | 09/28/2022 |
| Work Description | San Mateo US 101 Express Lanes North |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 04/08/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| douglas.inori@dot.ca.gov | Douglas Inori | Resident Engineer | Caltrans RE DB |
| tyler.pinell@dot.ca.gov | Tyler Pinell | Structural Representative | Caltrans SR DB |
| christopher.m.mcdermott@dot.ca.gov | Christopher McDermott | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 111-120 of 277 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2020-10-07-24 | 10/07/2020 | 10/08/2020 | Quality Control | Concrete | View |
| 2020-09-28-49 | 09/28/2020 | 09/29/2020 | Quality Control | Concrete | View |
| 2020-09-30-25 | 09/30/2020 | 10/02/2020 | Quality Control | Concrete | View |
| 2020-09-28-48 | 09/28/2020 | 09/29/2020 | Quality Control | Concrete | View |
| 2020-10-27-6 | 10/27/2020 | 10/28/2020 | Quality Assurance | Concrete | View |
| 2020-10-26-8 | 10/26/2020 | 10/28/2020 | Quality Assurance | Concrete | View |
| 2020-10-26-7 | 10/26/2020 | 10/28/2020 | Quality Assurance | Concrete | View |
| 2020-09-24-17 | 09/24/2020 | 10/27/2020 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2020-10-09-26 | 10/09/2020 | 10/27/2020 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2020-09-23-37 | 09/23/2020 | 09/25/2020 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| JMF3511-318-2021-100 | Submittal Accepted for Verification | CT D04 - Hayward DME / District Laboratory | 10/14/2021 | View |
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
