Project Details

This page displays current information for project DEA: 044G8404.

Project Information

Project IdentifiersProject ID: 212244
DEA: 044G8404
EFIS: 0413000051
DIST-CO-RTE-PM04-NAP-128-20.1/20.4
Award Date02/19/2019
Closeout Date06/27/2023
Work DescriptionREPLACE CAPELL CREEK BRIDGE
Location DescriptionNAPA COUNTY ABOUT 15 MILES EAST OF RUTHERFORD FROM 1.1 MILES EAST OF KNOXVILLE ROAD TO 0.3 MILE WEST OF CAPELL VALLEY CREST
QA Service Level1 (Verified on 05/20/2017)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
darren.isada@dot.ca.govDarren IsadaResident EngineerCaltrans RE DB
nana.budu@dot.ca.govNana BuduStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 111-114 of 114 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2019-07-02-507/02/201907/02/2019Quality AssuranceSMTL TM5 - Welded HoopsView
2019-07-02-207/02/201907/02/2019Quality ControlSMTL TM5 - Welded HoopsView
2019-07-02-107/02/201907/02/2019Quality AssuranceSMTL TM5 - Welded HoopsView
2015-12-31-612/31/201502/10/2017Quality ControlSoilView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month

Jan 2025Feb 2025Mar 2025Apr 2025May 2025Jun 2025Jul 2025Aug 2025Sep 2025Oct 2025Nov 2025Dec 20250123456SamplesTests

Number of Samples

11.4%51.8%17.5%CT - Unassigned/General Field Laboratory (2.6%)CT D04 - Concord Field Laboratory (0.9%)CT HQ - QASI Bay Area Field Office (1.8%)CT HQ - QASI Los Angeles Field Office (6.1%)CT HQ - QASI Sacramento Field Office (2.6%)CT HQ - Sacramento Aggregate Testing Laboratory (11.4%)CT HQ - Sacramento Concrete Testing Laboratory (51.8%)CT HQ - Sacramento Structural Materials Testing Laboratory (5.3%)CT SC - 3676 - 106 (17.5%)

Sample Types

87.7%Annual Source Testing (5.3%)Department Acceptance (2.6%)Quality Assurance (87.7%)Quality Control (4.4%)

Number of Tests

27.6%65.9%CT - Unassigned/General Field Laboratory (1.1%)CT D04 - Concord Field Laboratory (0.4%)CT HQ - Sacramento Aggregate Testing Laboratory (4.7%)CT HQ - Sacramento Chemistry Laboratory (0.4%)CT HQ - Sacramento Concrete Testing Laboratory (27.6%)CT HQ - Sacramento Structural Materials Testing Laboratory (65.9%)

Test Types

26.2%71.3%Annual Source Testing (2.2%)Department Acceptance (26.2%)Quality Assurance (71.3%)Quality Control (0.4%)

Material Types

11.4%68.4%Aggregate (11.4%)Concrete (68.4%)Concrete Core (0.9%)Hot Mix Asphalt (2.6%)SMTL TM1 - Elastomeric Bearing Pad (0.9%)SMTL TM3 - Fastener Assembly (7%)SMTL TM5 - Couplers (3.5%)SMTL TM5 - Welded Hoops (4.4%)Soil (0.9%)

Test Methods

ASTM C 39 (1.1%)CTM 202 (0.4%)CTM 213 (1.1%)CTM 214 (3.2%)ASTM D 2240 (0.4%)ASTM D 412 (0.4%)ASTM D 624 (0.4%)SMTL BILST (0.4%)CTM 670 (1.1%)CTM 670 (4.3%)