Project Details
This page displays current information for project DEA: 081J2704.
Project Information
| Project Identifiers | Project ID: 1000661 DEA: 081J2704 EFIS: 0818000014 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-247-0.0/23.0 |
| Award Date | 01/31/2025 |
| Closeout Date | Not set |
| Work Description | RUBBERIZED HMA, HMA (TYPE A), COLD PLANE AC PVMT & REPLACE AC SURF. |
| Location Description | SAN BERNARDINO COUNTY IN YUCCA VALLEY FROM ROUTE 62 TO 0.4 MILE WEST OF GIN ROAD |
| QA Service Level | 1 (Verified on 01/13/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| walid.saoud@dot.ca.gov | Walid Saoud | Resident Engineer | Caltrans RE DB |
| jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 111-120 of 141 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-06-12-51 | 06/12/2025 | 06/16/2025 | Quality Assurance | Concrete | View |
| 2025-06-12-50 | 06/12/2025 | 06/16/2025 | Quality Assurance | Concrete | View |
| 2025-06-11-49 | 06/11/2025 | 06/12/2025 | Quality Assurance | Concrete | View |
| 2025-06-11-48 | 06/11/2025 | 06/12/2025 | Quality Assurance | Concrete | View |
| 2025-06-10-56 | 06/10/2025 | 06/12/2025 | Quality Assurance | Concrete | View |
| 2025-06-10-55 | 06/10/2025 | 06/12/2025 | Quality Assurance | Concrete | View |
| 2025-06-09-63 | 06/09/2025 | 06/12/2025 | Quality Assurance | Concrete | View |
| 2025-06-10-51 | 06/10/2025 | 06/13/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-08-13 | 06/08/2025 | 06/13/2025 | Acceptance | Hot Mix Asphalt | View |
| 2025-06-11-39 | 06/11/2025 | 06/13/2025 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
