Project Details
This page displays current information for project DEA: 081J2604.
Project Information
| Project Identifiers | Project ID: 995060 DEA: 081J2604 EFIS: 0818000012 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-215-R13.5/R19.5 |
| Award Date | 01/10/2024 |
| Closeout Date | Not set |
| Work Description | RHMA, REPLACE AC SURFACING, ROCK BLANKET, AND COMPOST. |
| Location Description | RIVERSIDE COUNTY IN MURRIETA AND MENIFEE FROM 1.0 MILE NORTH OF CLINTON KEITH ROAD TO 1.0 MILE NORTH OF NEWPORT ROAD |
| QA Service Level | 1 (Verified on 08/15/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| osama.abdalla@dot.ca.gov | Osama Abdalla | Resident Engineer | Caltrans RE DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 101-110 of 165 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-08-04-31 | 08/04/2025 | 08/05/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-08-04-30 | 08/04/2025 | 08/05/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-08-04-29 | 08/04/2025 | 08/05/2025 | Verification | Aggregate | View |
| 2025-06-24-46 | 06/24/2025 | 06/26/2025 | Verification | Asphalt Rubber Binder | View |
| 2025-06-24-44 | 06/24/2025 | 06/26/2025 | Verification | Asphalt Binder | View |
| 2025-06-24-39 | 06/24/2025 | 06/26/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-06-24-38 | 06/24/2025 | 06/26/2025 | Verification | Crumb Rubber Modifier | View |
| 2025-06-24-37 | 06/24/2025 | 06/26/2025 | Verification | Aggregate | View |
| 2025-06-24-34 | 06/24/2025 | 06/26/2025 | Verification | Hot Mix Asphalt | View |
| 2025-05-29-49 | 05/29/2025 | 05/30/2025 | Verification | Asphalt Rubber Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
