Project Details
This page displays current information for project DEA: 081J2304.
Project Information
| Project Identifiers | Project ID: 994944 DEA: 081J2304 EFIS: 0818000002 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-60-R1.0/12.0 |
| Award Date | 09/20/2023 |
| Closeout Date | 04/28/2025 |
| Work Description | RAMP METERING SYSTEM, HMA (TYPE A), RDWY EXC, MOD SIGNAL & LTG SYSTEMS |
| Location Description | RIVERSIDE COUNTY IN AND NEAR JURUPA VALLEY AND RIVERSIDE AT VARIOUS LOCATIONS FROM WINEVILLE ROAD UNDERCROSSING TO 0.2 MILE WEST OF ROUTE 60/91 SEPARATION |
| QA Service Level | 1 (Verified on 07/28/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mahfual.alam@dot.ca.gov | Mahfual Alam | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 101-110 of 141 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-04-26-25 | 04/26/2024 | 05/03/2024 | Department Acceptance | Hot Mix Asphalt | View |
| 2024-04-18-52 | 04/18/2024 | 05/03/2024 | Department Acceptance | Hot Mix Asphalt | View |
| 2024-04-26-20 | 04/26/2024 | 05/03/2024 | Department Acceptance | Hot Mix Asphalt | View |
| 2024-04-18-51 | 04/18/2024 | 05/03/2024 | Department Acceptance | Hot Mix Asphalt | View |
| 2024-04-16-50 | 04/16/2024 | 04/29/2024 | Department Acceptance | Hot Mix Asphalt | View |
| 2024-04-19-41 | 04/19/2024 | 04/29/2024 | Department Acceptance | Hot Mix Asphalt | View |
| 2024-04-25-43 | 04/25/2024 | 04/29/2024 | Department Acceptance | Hot Mix Asphalt | View |
| 2024-04-15-51 | 04/15/2024 | 04/19/2024 | Verification | Aggregate | View |
| 2024-04-15-48 | 04/15/2024 | 04/19/2024 | Verification | Asphalt Binder | View |
| 2024-04-15-43 | 04/15/2024 | 04/15/2024 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
