Project Details
This page displays current information for project DEA: 07313504.
Project Information
| Project Identifiers | Project ID: 994654 DEA: 07313504 EFIS: 0715000090 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,VEN-1-37.7/62.9,0.0/0.9 |
| Award Date | 07/20/2023 |
| Closeout Date | Not set |
| Work Description | REMOVE AND CONSTRUCT BRIDGE AND CULVERTS. |
| Location Description | LOS ANGELES AND VENTURA COUNTIES AT VARIOUS LOCATIONS FROM 0.4 MILE SOUTH OF TEMESCAL CANYON ROAD TO 0.1 MILE NORTH OF TONGA STREET |
| QA Service Level | 1 (Verified on 07/24/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| dan.leon@dot.ca.gov | Dan Leon | Resident Engineer | Caltrans RE DB |
| aziz.maghsoudloo@bureauveritas.com | Aziz Maghsoudloo | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 101-110 of 147 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-05-06-82 | 05/06/2024 | 05/07/2024 | Quality Control | Concrete | View |
| 2024-05-02-103 | 05/02/2024 | 05/03/2024 | Quality Control | Concrete | View |
| 2024-04-24-113 | 04/24/2024 | 04/25/2024 | Quality Control | Aggregate | View |
| 2024-04-24-112 | 04/24/2024 | 04/25/2024 | Quality Control | Concrete | View |
| 2024-04-23-115 | 04/23/2024 | 04/24/2024 | Quality Control | Aggregate | View |
| 2024-04-23-114 | 04/23/2024 | 04/23/2024 | Quality Control | Concrete | View |
| 2024-04-22-132 | 04/22/2024 | 04/23/2024 | Quality Control | Aggregate | View |
| 2024-04-22-131 | 04/22/2024 | 04/23/2024 | Quality Control | Concrete | View |
| 2024-04-19-79 | 04/19/2024 | 04/20/2024 | Quality Control | Aggregate | View |
| 2024-04-19-78 | 04/19/2024 | 04/20/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
