Project Details
This page displays current information for project DEA: 060W1704.
Project Information
| Project Identifiers | Project ID: 994109 DEA: 060W1704 EFIS: 0617000103 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-41-R27.4/R28.5 |
| Award Date | 11/08/2022 |
| Closeout Date | Not set |
| Work Description | REMOVE AC PAVEMENT, WIDEN TRAVEL WAY, AND CONSTRUCT RETAINING WALL. |
| Location Description | FRESNO COUNTY IN FRESNO FROM 0.1 MILE SOUTH OF ASHLAN AVENUE OVERCROSSING TO SHAW AVENUE OVERCROSSING |
| QA Service Level | 1 (Verified on 07/13/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mark.mengoni@dot.ca.gov | Mark Mengoni | Resident Engineer | Caltrans RE DB |
| benjamin.holton@anseradvisory.com | Benjamin Holton | Structural Representative | Caltrans SR DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 101-109 of 109 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-04-17-7 | 04/17/2023 | 04/17/2023 | Quality Assurance | Aggregate | View |
| 2023-04-14-5 | 04/14/2023 | 04/14/2023 | Quality Assurance | Soil | View |
| 2023-04-13-14 | 04/13/2023 | 04/13/2023 | Quality Assurance | Soil | View |
| 2023-04-13-13 | 04/13/2023 | 04/13/2023 | Quality Assurance | Soil | View |
| 2023-04-13-12 | 04/13/2023 | 04/13/2023 | Quality Assurance | Soil | View |
| 2023-04-13-7 | 04/13/2023 | 04/13/2023 | Quality Assurance | Soil | View |
| 2023-04-06-18 | 04/06/2023 | 04/06/2023 | Quality Assurance | Soil | View |
| 2023-03-30-32 | 03/30/2023 | 03/30/2023 | Department Acceptance | Soil | View |
| 2023-03-28-15 | 03/28/2023 | 03/28/2023 | Department Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
