Project Details
This page displays current information for project DEA: 040A5344.
Project Information
| Project Identifiers | Project ID: 208852 DEA: 040A5344 EFIS: 0400021131 COOP: 042491 |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-80,80-R11.4/13.0 |
| Award Date | 03/19/2014 |
| Closeout Date | 10/12/2018 |
| Work Description | REALIGN I-680 TO CONNECT DIRECTLY WITH THE I-80/SR-12 INTERCHANGE. |
| Location Description | IN SOLANO COUNTY NEAR FAIRFIELD. |
| QA Service Level | 1 (Verified on 10/17/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| noel.aquino@dot.ca.gov | Noel AQUINO | Resident Engineer | Caltrans RE DB |
| ryan.stiltz@dot.ca.gov | Ryan Stiltz | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 101-110 of 158 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2015-06-12-5 | 06/12/2015 | 06/15/2015 | Quality Control | Concrete | View |
| 2015-06-12-4 | 06/12/2015 | 06/15/2015 | Quality Control | Concrete | View |
| 2015-06-12-3 | 06/12/2015 | 06/15/2015 | Quality Control | Concrete | View |
| 2015-06-12-2 | 06/12/2015 | 06/15/2015 | Quality Control | Concrete | View |
| 2015-06-11-5 | 06/11/2015 | 06/12/2015 | Quality Control | Concrete | View |
| 2015-06-11-4 | 06/11/2015 | 06/12/2015 | Quality Control | Concrete | View |
| 2015-05-22-7 | 05/22/2015 | 05/29/2015 | Quality Control | Concrete | View |
| 2015-05-18-1 | 05/18/2015 | 05/19/2015 | Verification | Concrete | View |
| 2015-05-13-1 | 05/13/2015 | 05/14/2015 | Verification | Concrete | View |
| 2015-05-11-1 | 05/11/2015 | 05/12/2015 | Verification | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
