Project Details
This page displays current information for project DEA: 050N7054.
Project Information
| Project Identifiers | Project ID: 1000199 DEA: 050N7054 EFIS: 0518000111 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-10.4/11.1 |
| Award Date | 07/23/2024 |
| Closeout Date | Not set |
| Work Description | South Coast 101 HOV Lanes Project 4E South- Santa Barbara |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 08/14/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| luobao.cai@dot.ca.gov | Luobao Cai | Resident Engineer | Caltrans RE DB |
| faris.omer.malik@dot.ca.gov | Faris Malik | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 101-110 of 116 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-05-15-13 | 05/15/2025 | 05/15/2025 | Quality Assurance | Aggregate | View |
| 2025-05-14-29 | 05/14/2025 | 05/14/2025 | Quality Assurance | Concrete | View |
| 2025-05-14-26 | 05/14/2025 | 05/14/2025 | Quality Assurance | Aggregate | View |
| 2025-05-12-20 | 05/12/2025 | 05/12/2025 | Quality Assurance | Concrete | View |
| 2025-05-12-19 | 05/12/2025 | 05/12/2025 | Quality Assurance | Aggregate | View |
| 2024-12-13-54 | 12/13/2024 | 12/14/2024 | Quality Control | Concrete | View |
| 2025-04-01-3 | 04/01/2025 | 04/01/2025 | Quality Assurance | Concrete | View |
| 2025-04-01-2 | 04/01/2025 | 04/01/2025 | Quality Assurance | Aggregate | View |
| 2025-01-13-24 | 01/13/2025 | 02/03/2025 | Dispute Resolution | Hot Mix Asphalt | View |
| 2024-12-13-29 | 12/13/2024 | 12/13/2024 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
