Project Details
This page displays current information for project DEA: 09213404.
Project Information
Project Identifiers | Project ID: 214135 DEA: 09213404 EFIS: 0900000030 |
---|---|
DIST-CO-RTE-PM | 09-INY-395-29.9/41.8 |
Award Date | 10/22/2021 |
Closeout Date | Not set |
Work Description | ROADWAY EXCAVATION, PLACE HMA (TYPE A), AND ALTERNATIVE PIPE CULVERT. |
Location Description | INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE |
QA Service Level | 1 (Verified on 05/03/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
kris.raber@nv5.com | Kris Raber | Resident Engineer | Caltrans RE DB |
sheila.reyes@dot.ca.gov | Sheila Reyes | Structural Representative | Caltrans SR DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1081-1090 of 1132 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-07-05-43 | 07/05/2022 | 07/06/2022 | Quality Control | Concrete | View |
2022-07-01-59 | 07/01/2022 | 07/05/2022 | Quality Control | Concrete | View |
2022-06-30-49 | 06/30/2022 | 07/01/2022 | Quality Control | Concrete | View |
2022-06-29-49 | 06/29/2022 | 06/30/2022 | Quality Control | Concrete | View |
2022-06-28-54 | 06/28/2022 | 06/29/2022 | Quality Control | Concrete | View |
2022-06-27-44 | 06/27/2022 | 06/28/2022 | Quality Control | Concrete | View |
2022-06-24-55 | 06/24/2022 | 06/27/2022 | Quality Control | Concrete | View |
2022-06-23-77 | 06/23/2022 | 06/24/2022 | Quality Control | Concrete | View |
2022-06-22-51 | 06/22/2022 | 06/23/2022 | Quality Control | Concrete | View |
2022-06-21-69 | 06/21/2022 | 06/22/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods