Project Details
This page displays current information for project DEA: 07316004.
Project Information
| Project Identifiers | Project ID: 214649 DEA: 07316004 EFIS: 0715000194 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-14-60.70 |
| Award Date | 02/07/2023 |
| Closeout Date | Not set |
| Work Description | REHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES. |
| Location Description | ROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE. |
| QA Service Level | 1 (Verified on 01/29/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| james.w.shih@dot.ca.gov | James Shih | Resident Engineer | Caltrans RE DB |
| hossein.sabbagh@bureauveritas.com | Hossein Sabbagh | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1041-1050 of 1483 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-03-18-29 | 03/18/2024 | 03/25/2024 | Department Acceptance | Hot Mix Asphalt | View |
| 2024-03-21-45 | 03/21/2024 | 03/21/2024 | Quality Assurance | Concrete | View |
| 2024-03-19-20 | 03/19/2024 | 03/19/2024 | Quality Assurance | Aggregate | View |
| 2024-03-18-21 | 03/18/2024 | 03/18/2024 | Quality Assurance | Aggregate | View |
| 2024-03-01-20 | 03/01/2024 | 03/12/2024 | Department Acceptance | Aggregate | View |
| 2024-03-15-22 | 03/15/2024 | 03/18/2024 | Department Acceptance | Hot Mix Asphalt | View |
| 2024-03-14-41 | 03/14/2024 | 03/18/2024 | Department Acceptance | Hot Mix Asphalt | View |
| 2024-03-04-35 | 03/04/2024 | 03/18/2024 | Department Acceptance | Hot Mix Asphalt | View |
| 2024-03-11-23 | 03/11/2024 | 03/12/2024 | Department Acceptance | Hot Mix Asphalt | View |
| 2024-03-13-27 | 03/13/2024 | 03/13/2024 | Department Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods