Project Details
This page displays current information for project DEA: 101E3004.
Project Information
| Project Identifiers | Project ID: 995125 DEA: 101E3004 EFIS: 1018000273 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-5-32.5/49.8 |
| Award Date | 01/12/2024 |
| Closeout Date | Not set |
| Work Description | REMOVE EXISTING PAVEMENT AND REPLACE WITH CONCRETE PAVEMENT. |
| Location Description | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE |
| QA Service Level | 1 (Verified on 09/26/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| ariel.mendoza@dot.ca.gov | Ariel Mendoza | Resident Engineer | Caltrans RE DB |
| justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 91-100 of 208 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-06-05-62 | 06/05/2025 | 06/09/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-06-06-41 | 06/06/2025 | 06/10/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-06-06-40 | 06/06/2025 | 06/09/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-06-05-60 | 06/05/2025 | 06/05/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-06-05-59 | 06/05/2025 | 06/06/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-06-04-91 | 06/04/2025 | 06/09/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-06-04-90 | 06/04/2025 | 06/04/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-06-04-89 | 06/04/2025 | 06/06/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-06-04-88 | 06/04/2025 | 06/05/2025 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-06-03-79 | 06/03/2025 | 06/06/2025 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
