Project Details
This page displays current information for project DEA: 050N74U4.
Project Information
| Project Identifiers | Project ID: 994864 DEA: 050N74U4 EFIS: 0522000025 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-9.9/10.6 |
| Award Date | 07/10/2023 |
| Closeout Date | Not set |
| Work Description | SB 101 4D North San Ysidro to Olive Mill |
| Location Description | In Santa Barbara County in and near Santa Barbara from 0.1 mile south of San Ysidro Road Overcrossing to 0.1 north of Olive Mill Road Overcrossing |
| QA Service Level | 1 (Verified on 08/21/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| taylor.merlo@dot.ca.gov | Taylor Merlo | Resident Engineer | Caltrans RE DB |
| emiliano.berntsen@dot.ca.gov | Emiliano Berntsen | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 91-100 of 421 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-07-20-9 | 07/20/2025 | 07/23/2025 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2025-06-19-1 | 06/19/2025 | 06/19/2025 | Acceptance | Roadway/Bridge Surface | View |
| 2025-05-22-7 | 05/22/2025 | 05/22/2025 | Quality Assurance | Concrete | View |
| 2025-05-22-5 | 05/22/2025 | 05/22/2025 | Quality Assurance | Aggregate | View |
| 2024-10-29-101 | 10/29/2024 | 10/30/2024 | Quality Control | Concrete | View |
| 2025-04-25-6 | 04/25/2025 | 04/25/2025 | Quality Assurance | Concrete | View |
| 2025-04-25-5 | 04/25/2025 | 04/25/2025 | Quality Assurance | Concrete | View |
| 2025-04-25-4 | 04/25/2025 | 04/25/2025 | Quality Assurance | Concrete | View |
| 2025-04-25-3 | 04/25/2025 | Quality Assurance | Concrete | View | |
| 2025-04-25-2 | 04/25/2025 | 04/25/2025 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
