Project Details
This page displays current information for project DEA: 043J0624.
Project Information
| Project Identifiers | Project ID: 993804 DEA: 043J0624 EFIS: 0419000534 |
|---|---|
| DIST-CO-RTE-PM | 04-SM-101-16.5/23.0 |
| Award Date | 08/24/2022 |
| Closeout Date | 04/10/2024 |
| Work Description | COLD PLANE AND PLACE HMA, REPLACE GUARDRAIL AND CURB RAMPS. |
| Location Description | SAN MATEO COUNTY AT VARIOUS LOCATION FROM BROADWAY OVERCROSSING TO 0.2 MILE NORTH OF OYSTER POINT BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 05/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| douglas.inori@dot.ca.gov | Douglas Inori | Resident Engineer | Caltrans RE DB |
| waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 91-100 of 111 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-08-31-40 | 08/31/2023 | 09/01/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-31-39 | 08/31/2023 | 09/01/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-30-50 | 08/30/2023 | 08/31/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-30-49 | 08/30/2023 | 08/31/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-29-58 | 08/29/2023 | 08/30/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-29-57 | 08/29/2023 | 08/30/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-28-48 | 08/28/2023 | 08/29/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-28-47 | 08/28/2023 | 08/29/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-24-47 | 08/24/2023 | 08/25/2023 | Quality Assurance | Hot Mix Asphalt | View |
| 2023-08-23-79 | 08/23/2023 | 08/24/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
