Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 1-10 of 17737 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
208557 | Project ID: 208557 DEA: 65A0781 EFIS: 0017000212 | 03-YOL-- | Type 86H Concrete Bridge Rail | Caltrans Dynamic Test Facility | NOT VERIFIED | Details CEM-3701 Report | |
208821 | Project ID: 208821 DEA: 081C8004 | 08--215-38.6 | REPAIR 72" CMP | 02/14/2013 | NOT VERIFIED | Details CEM-3701 Report | |
99999 | Project ID: 99999 DEA: 0322222 | 03-SAC,OMG-888,99,80-0.6-0.6 | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. | (04/05/2013) | Details CEM-3701 Report | |
210053 | Project ID: 210053 EFIS: 0000000764 | --- | Crush test | NOT VERIFIED | Details CEM-3701 Report | ||
210188 | Project ID: 210188 DEA: 656A27520 EFIS: 0000001176 | --- | Type 50C Median Barrier Test Section | CHP Academy - RSRG Dynamic Test Facility | NOT VERIFIED | Details CEM-3701 Report | |
88888 | Project ID: 88888 DEA: SMTL-STOCK EFIS: SMTL-STOCK | 59--- | Special project for SMTL stock material. Object Code: 1025. J2 DEA: 912680. | NOT VERIFIED | Details CEM-3701 Report | ||
211144 | Project ID: 211144 DEA: 6TTSC EFIS: 6TTSC | --- | Special project in support of DES Substructure Committee. The committee is in the process of developing standard procedures for evaluation and approval of new slurry systems that will be submitted to Caltrans. The purpose of this laboratory testing is to measure and document the compressive streng | NOT VERIFIED | Details CEM-3701 Report | ||
211145 | Project ID: 211145 DEA: 6TCASUBSTR EFIS: 6TCASUBSTR | --- | Special project in support of DES Substructure Committee. The committee is in the process of developing standard procedures for evaluation and approval of new slurry systems that will be submitted to Caltrans. The purpose of this laboratory testing is to measure and document the compressive streng | NOT VERIFIED | Details CEM-3701 Report | ||
88889 | Project ID: 88889 DEA: CEMENT1 EFIS: CEMENT1 | 59--- | Special project for Caltrans cement lab. | NOT VERIFIED | Details CEM-3701 Report | ||
212756 | Project ID: 212756 DEA: 65A0617 | --- | Type 15 FBS , ST-75 Bridge Rail, Type 85 Concrete Bridge Rail | NOT VERIFIED | Details CEM-3701 Report |