Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9981-9990 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213121 | Project ID: 213121 DEA: 09373504 EFIS: 0918000003 | 09-MNO-395-93.7/106.3 | CONSTRUCT HOT MIX ASPHALT OVER COLD IN-PLACE RECYCLED PAVEMENT. | MONO COUNTY NEAR WALKER FROM ROUTE 108 TO EASTSIDE LANE | 12/02/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 213122 | Project ID: 213122 DEA: 11292804 EFIS: 1113000044 | 11-SD-52-3.9/6.6 | EROSION REPAIR, INCLUDING CELLULAR CONFINEMENT SYSTEM | SAN DIEGO COUNTY IN SAN DIEGO FROM ROUTE 805/52 SEPARATION TO ROUTE 163/52 SEPARATION | 08/24/2021 | 1 (07/30/2018) | Details CEM-3701 Report |
| 213123 | Project ID: 213123 DEA: 112N0134 EFIS: 1117000158 | 11-IMP-86-20.4/21.8,R27.0/28.0 | MILL AND REPLACE WITH SAMI AND RHMA, CONSTRUCT SIDEWALK AND BUS PADS | IMPERIAL COUNTY IN AND NEAR BRAWLEY AND WESTMORLAND FROM I STREET TO BRANDT ROAD AND FROM 0.2 MILE SOUTH OF B STREET TO MARTIN ROAD | 12/17/2019 | 1 (05/30/2018) | Details CEM-3701 Report |
| 213124 | Project ID: 213124 DEA: 112N0184 EFIS: 1117000166 | 11-SD-79-L0.0/20.2 | APPLY BONDED WEARING COURSE OVERLAY, SHOULDER BACKING AND COLD PLANE. | SAN DIEGO COUNTY NEAR DESCANSO FROM ROUTE 8/79 SEPARATION TO EAST JUNCTION ROUTE 79/78 NEAR JULIAN | 04/09/2019 | 1 (07/30/2018) | Details CEM-3701 Report |
| 213125 | Project ID: 213125 DEA: 11405804 EFIS: 1100020271 | 11-SD-5,8,52,75,163,805-Various | UPGRADE PEDESTRIAN RAMPS | SAN DIEGO COUNTY AT VARIOUS LOCATIONS | 06/10/2020 | 1 (08/14/2018) | Details CEM-3701 Report |
| 213126 | Project ID: 213126 DEA: 051J6604 EFIS: 0051800009 | 05-SB-192-8.0/12.5 | Replace bridges (3) and bridge rails (2) | In Santa Barbara County in and near Santa Barbara, Montecito, and Carpinteria. | 10/29/2020 | 1 (05/14/2018) | Details CEM-3701 Report |
| 213454 | Project ID: 213454 DEA: 125T4004 | 12-ORA-TMC- | Replace two (2) failing HVAC Chiller Units | 07/01/2024 | 1 (03/16/2021) | Details CEM-3701 Report | |
| 213130 | Project ID: 213130 Permit Numbers: 12156MC0454 | 12-ORA-90-6.3/6.3 | PERFORM THE FOLLOWING WORK WITHIN THE STATE RIGHT OF WAY ON IMPERIAL HWY. AT KRAEMER BLVD. IN THE CITY OF BREA.1. REMOVE AND REPLACE SIX EXISTING TRAFFIC SIGNAL POLES WITH NEW POLES AND MAST ARMS TO ALLOW A DUAL LEFT TURN FROM SHOPPING CENTER TO WB SR-90.2. SIGNING AND STRIPING IMPROVEMENTS TO NORT | 2500 IMPERIAL HWY, BREA | 08/24/2021 | 1 (02/14/2018) | Details CEM-3701 Report |
| 213133 | Project ID: 213133 DEA: 021H9404 EFIS: 0216000158 | 02-SHA-5,273-R52.1,17.1 | BRIDGE JOINT SEALS AND STRUCTURAL CONCRETE. | SHASTA COUNTY ON ROUTE 5 AT SACRAMENTO RIVER BRIDGE OVERHEAD AND ON ROUTE 273 AT SACRAMENTO RIVER BRIDGE | 01/09/2019 | 1 (05/23/2018) | Details CEM-3701 Report |
| 213134 | Project ID: 213134 DEA: 024F77U4 EFIS: 0217000022 | 02-MOD-299-23.1/23.6, 24.5/33.5 | BRIDGE REPLACE, ROADWAY REHAB/FULL DEPTH RECLAMATION-CEMENT + HMA | MODOC COUNTY ABOUT 6 MILES WEST OF ALTURAS FROM 0.3 MILE WEST TO 0.3 MILE EAST OF CALDWELL CREEK BRIDGE AND 1.1 MILES EAST OF CALDWELL CREEK BRIDGE TO 1.7 MILES WEST OF COUNTY ROAD 75 | 09/02/2020 | 1 (04/02/2018) | Details CEM-3701 Report |
