Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 9961-9970 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993662Project ID: 993662
DEA: 061A6404
EFIS: 0620000176
06-FRE-41,180-R23.1,R58.7PLACE POLYESTER CONCRETE OVERLAY AND REPLACE JOINT SEAL ASSEMBLY.FRESNO COUNTY IN FRESNO ON ROUTE 41 AT VENTURA AVENUE VIADUCT AND ON ROUTE 180 AT ROUTE 180/41 CONNECTOR SEPARATION04/24/20241 (04/04/2022)Details CEM-3701 Report
7579Project ID: 7579
DEA: 060C1104
EFIS: 0600000934
06-FRE-180-R58.4/R60.4BRAIDED RAMPSFRESNO COUNTY IN FRESNO ON ROUTE 180 FROM INTERCHANGE WITH ROUTE 41 TO INTERCHANGE WITH ROUTE 16804/24/20181 (12/20/2012)Details CEM-3701 Report
3349Project ID: 3349
DEA: 060L8404
06-FRE-168,180-R0.8/R10.5,R54.2/R62.9INSTALL MICROWAVE VEHICLE DETECTION SYSTEM.FRESNO COUNTY IN FRESNO ON ROUTE 168 FROM ROUTE 180 TO DEWOLF AVENUE AND ON ROUTE 180 FROM MARKS AVENUE TO CLOVIS AVENUE08/17/20121 (05/16/2011)Details CEM-3701 Report
3238Project ID: 3238
DEA: 060J1604
06-FRE-99-17.3/18.0STORM WATER IMPROVEMENT.FRESNO COUNTY IN FRESNO FROM NORTH AVENUE OVERCROSSING TO 0.5 MILE SOUTH OF JENSEN AVENUE UNDERCROSSING12/13/20121 (06/21/2010)Details CEM-3701 Report
3272Project ID: 3272
DEA: 060J8904
06-FRE-180S-R60.4/R63.0Median barrier is to be constructed.FRESNO COUNTY IN FRESNO FROM MAPLE AVENUE UNDERCROSSING TO CLOVIS AVENUE OVERCROSSING04/21/20111 (02/15/2010)Details CEM-3701 Report
7312Project ID: 7312
DEA: 060P5404
06-FRE-99-20.7/28.1COLD PLANE AND OVERLAY WITH HMA (BONDED WEARING COURSE-OPEN GRADED)FRESNO COUNTY IN FRESNO FROM FRESNO STREET OVERCROSSING TO SHAW AVENUE OVERCROSSING08/28/20121 (05/14/2012)Details CEM-3701 Report
213285Project ID: 213285
DEA: 060W7704
EFIS: 0617000280
06-FRE-41-R23.7/R26.5PCC GRIND AND INSTALL JOINT SEALS.FRESNO COUNTY IN FRESNO FROM DIVISADERO STREET OVERCROSSING TO SHIELDS AVENUE UNDERCROSSING12/26/2018NOT VERIFIEDDetails CEM-3701 Report
7055Project ID: 7055
DEA: 060E9714
EFIS: 0600020253
06-FRE-41-R27.6/R30.4REPLACEMENT PLANTING AND IRRIGATION SYSTEM TO BE INSTALLED.FRESNO COUNTY IN FRESNO FROM ASHLAN AVENUE OVERCROSSING TO HERNDON AVENUE UNDERCROSSING04/19/20181 (06/07/2012)Details CEM-3701 Report
3362Project ID: 3362
DEA: 060M4804
EFIS: 0600020026
06-FRE-41-R22.5/R31.7SEAL JOINTS EXISTING PCC PAVEMENT.FRESNO COUNTY IN FRESNO FROM 3.0 MILES NORTH OF ROUTE 41/99 SEPARATION TO FRIANT ROAD UNDERCROSSING05/21/20201 (03/21/2011)Details CEM-3701 Report
7501Project ID: 7501
DEA: 06342564
EFIS: 0600000383
06-FRE-180-R62.6/66.3PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEMFRESNO COUNTY IN FRESNO FROM 0.3 MILE WEST OF CLOVIS AVENUE OVERCROSSING TO 0.8 MILE EAST OF TEMPERANCE AVENUE08/24/20181 (08/13/2012)Details CEM-3701 Report