Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9961-9970 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 993662 | Project ID: 993662 DEA: 061A6404 EFIS: 0620000176 | 06-FRE-41,180-R23.1,R58.7 | PLACE POLYESTER CONCRETE OVERLAY AND REPLACE JOINT SEAL ASSEMBLY. | FRESNO COUNTY IN FRESNO ON ROUTE 41 AT VENTURA AVENUE VIADUCT AND ON ROUTE 180 AT ROUTE 180/41 CONNECTOR SEPARATION | 04/24/2024 | 1 (04/04/2022) | Details CEM-3701 Report |
| 7579 | Project ID: 7579 DEA: 060C1104 EFIS: 0600000934 | 06-FRE-180-R58.4/R60.4 | BRAIDED RAMPS | FRESNO COUNTY IN FRESNO ON ROUTE 180 FROM INTERCHANGE WITH ROUTE 41 TO INTERCHANGE WITH ROUTE 168 | 04/24/2018 | 1 (12/20/2012) | Details CEM-3701 Report |
| 3349 | Project ID: 3349 DEA: 060L8404 | 06-FRE-168,180-R0.8/R10.5,R54.2/R62.9 | INSTALL MICROWAVE VEHICLE DETECTION SYSTEM. | FRESNO COUNTY IN FRESNO ON ROUTE 168 FROM ROUTE 180 TO DEWOLF AVENUE AND ON ROUTE 180 FROM MARKS AVENUE TO CLOVIS AVENUE | 08/17/2012 | 1 (05/16/2011) | Details CEM-3701 Report |
| 3238 | Project ID: 3238 DEA: 060J1604 | 06-FRE-99-17.3/18.0 | STORM WATER IMPROVEMENT. | FRESNO COUNTY IN FRESNO FROM NORTH AVENUE OVERCROSSING TO 0.5 MILE SOUTH OF JENSEN AVENUE UNDERCROSSING | 12/13/2012 | 1 (06/21/2010) | Details CEM-3701 Report |
| 3272 | Project ID: 3272 DEA: 060J8904 | 06-FRE-180S-R60.4/R63.0 | Median barrier is to be constructed. | FRESNO COUNTY IN FRESNO FROM MAPLE AVENUE UNDERCROSSING TO CLOVIS AVENUE OVERCROSSING | 04/21/2011 | 1 (02/15/2010) | Details CEM-3701 Report |
| 7312 | Project ID: 7312 DEA: 060P5404 | 06-FRE-99-20.7/28.1 | COLD PLANE AND OVERLAY WITH HMA (BONDED WEARING COURSE-OPEN GRADED) | FRESNO COUNTY IN FRESNO FROM FRESNO STREET OVERCROSSING TO SHAW AVENUE OVERCROSSING | 08/28/2012 | 1 (05/14/2012) | Details CEM-3701 Report |
| 213285 | Project ID: 213285 DEA: 060W7704 EFIS: 0617000280 | 06-FRE-41-R23.7/R26.5 | PCC GRIND AND INSTALL JOINT SEALS. | FRESNO COUNTY IN FRESNO FROM DIVISADERO STREET OVERCROSSING TO SHIELDS AVENUE UNDERCROSSING | 12/26/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7055 | Project ID: 7055 DEA: 060E9714 EFIS: 0600020253 | 06-FRE-41-R27.6/R30.4 | REPLACEMENT PLANTING AND IRRIGATION SYSTEM TO BE INSTALLED. | FRESNO COUNTY IN FRESNO FROM ASHLAN AVENUE OVERCROSSING TO HERNDON AVENUE UNDERCROSSING | 04/19/2018 | 1 (06/07/2012) | Details CEM-3701 Report |
| 3362 | Project ID: 3362 DEA: 060M4804 EFIS: 0600020026 | 06-FRE-41-R22.5/R31.7 | SEAL JOINTS EXISTING PCC PAVEMENT. | FRESNO COUNTY IN FRESNO FROM 3.0 MILES NORTH OF ROUTE 41/99 SEPARATION TO FRIANT ROAD UNDERCROSSING | 05/21/2020 | 1 (03/21/2011) | Details CEM-3701 Report |
| 7501 | Project ID: 7501 DEA: 06342564 EFIS: 0600000383 | 06-FRE-180-R62.6/66.3 | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM | FRESNO COUNTY IN FRESNO FROM 0.3 MILE WEST OF CLOVIS AVENUE OVERCROSSING TO 0.8 MILE EAST OF TEMPERANCE AVENUE | 08/24/2018 | 1 (08/13/2012) | Details CEM-3701 Report |
