Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9951-9960 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209817 | Project ID: 209817 DEA: 074X3104 EFIS: 0714000336 | 07-LA-10-09.7 /10.4 | REPLACE FAILED PCC PVMT SLABS | IN LA FR HAUSER BL UC / LA BREA AV UC | 1 (08/15/2014) | Details CEM-3701 Report | |
| 209816 | Project ID: 209816 EFIS: 1013000103 MINOR: 10A1645 | 10-ALP--VAR | RADIO COMMUNICATION INFRASTRUCTURE | CONSTRUCTION ON STATE HIGHWAY 4, 89, 108 IN ALPINE AND TUOLUMNE COUNTIES AT VARIOUS LOCATIONS | 12/06/2019 | 1 (07/22/2014) | Details CEM-3701 Report |
| 209815 | Project ID: 209815 EFIS: 1013000068 MINOR: 10A1630 | 10-ALP--Various | Replace Culvert and Install Cured in Place Pipeliner | For Construction in Alpine and Mariposa Counties | 12/06/2019 | 1 (07/22/2014) | Details CEM-3701 Report |
| 209812 | Project ID: 209812 DEA: 04264H34 EFIS: 0414000221 COOP: 042535 | 04-MRN-101-18.6/27.7 | PHASE 1 OF MARIN -SONOMA NARROWS HIGH OCCUPANCY VEHICLE WIDENING PROJECT I | IN MARIN COUNTY IN NOVATO AND NEAR BURDELL AT VARIOUS LOCATIONS FROM SOUTH NOVATO BOULEVARD OVERCROSSINGTO 0.3 MILE NORTH OF REDWOOD LANDFILL OVERCROSSING | 12/22/2017 | 1 (09/17/2015) | Details CEM-3701 Report |
| 209811 | Project ID: 209811 DEA: 042A9304 EFIS: 0400000847 COOP: 042272A2 | 04--- | Removal of non-native, invasive plant species and reintroduction of approved native plants | In the Fort Baker area of Golden Gate National Recreation Area (GGNRA) and in adjacent areas north of Waldo Tunnel extending to Rodeo Avenue along US Route 101 within Sausalito | 06/08/2020 | 1 (02/03/2020) | Details CEM-3701 Report |
| 209810 | Project ID: 209810 DEA: 080Q6004 EFIS: 0800020418 MINOR: 08A2377 | 08-SBD-2-4.03 | INCREASE THE HEIGHT AND PLACE ROCK SLOPE PROTECTION ON THE CHANNEL SIDE FACE OF EXISTING LEVEE | Near Wrightwood at PM 4.0 of Rte 2 from 1.6 mile east of Sheep Creek Bridge to 2.4 mile west of Rte 138 | 08/20/2014 | 1 (07/16/2014) | Details CEM-3701 Report |
| 209809 | Project ID: 209809 DEA: 041G6504 EFIS: 0400020538 COOP: 042316 | 04-SF-101-5.0/6.0 | Install new pedestrian tunnel connecting a future hospital and medical office building | Beneath and across a portion of Rte 101 in the City and County of SF at Van Ness Ave | 02/12/2025 | 1 (08/11/2014) | Details CEM-3701 Report |
| 209808 | Project ID: 209808 DEA: 024G3204 EFIS: 0213000101 MINOR: 02A1360 | 02-SHA-44-34 | Install Picnic Area Lighting | At Shingletown SRRA | 12/21/2020 | 1 (08/12/2014) | Details CEM-3701 Report |
| 209807 | Project ID: 209807 Permit Numbers: 0813NSN0514 | 08-RIV-60-14.3/14.3 | Entering upon State Right of Way at SR-60 and Sunnymead Blvd., to install CCTV camera pole with a post top CCTV camera for traffic monitoring, install a 334-CCTV cabinet for communication equipment, provide electrical service via new breaker in existing service pedestal for adjacent traffic signal | Frederick Street/Pigeon Pass Road, Moreno Valley | 07/31/2018 | 1 (08/15/2014) | Details CEM-3701 Report |
| 209806 | Project ID: 209806 Permit Numbers: 1212NMC0698 | 12-ORA-5-15.4/15.4 | Construct new curb, gutter, sidewalk, curb ramp and AC pavement, and perform traffic signal modification at I-5 NB off-Ramp to accommodate the widening of the Oso Parkway from I-5 FWY 0n-Ramp and Off-Ramp to Country Club Drive in the City of Mission Viejo, PM: 15.4.All performed work shall be in ac | Oso Parkway, Mission Viejo | 06/30/2015 | NOT VERIFIED | Details CEM-3701 Report |
