Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 9941-9950 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
215629Project ID: 215629
DEA: 060U0304
EFIS: 0615000184
06-FRE-33,198-24.3,22.7/22.9WIDEN INTERSECTION, PLACE LIGHTING, TRAFFIC MONITOR STATION & CULVERT.FRESNO COUNTY NEAR COALINGA ON ROUTE 33 AT ROUTE 198 AND ON ROUTE 198 FROM 0.1 MILE SOUTH OF JUNCTION ROUTE 33/198 TO 0.1 MILE NORTH OF JUNCTION ROUTE 33/19801/12/20231 (03/29/2021)Details CEM-3701 Report
212135Project ID: 212135
DEA: 060V5104
EFIS: 0616000167
06-FRE-198-22.7/26.3COLD PLANE AC PAVEMENT AND RHMA OVERLAY (BONDED WEARING COARSE).FRESNO COUNTY NEAR COALINGA FROM ROUTE 198/33 NORTH JUNCTION TO 0.5 MILE WEST OF ROUTE 198/5 SEPARATION04/16/20211 (01/09/2019)Details CEM-3701 Report
211273Project ID: 211273
DEA: 060T5504
EFIS: 0615000151
06-FRE-198-0.0/3.5REPAIR FAILED AREAS AND HOT MIX ASPHALT RESURFACE.FRESNO COUNTY NEAR COALINGA FROM MONTEREY COUNTY LINE TO 0.8 MILE WEST OF HANS GRIEVE CANYON ROAD04/16/20211 (10/04/2016)Details CEM-3701 Report
214808Project ID: 214808
DEA: 060Y0404
EFIS: 0619000152
06-FRE-198-7.8/9.8,13.6/16.6COLD PLANE AC PAVEMENT AND HMA OVERLAY.FRESNO COUNTY NEAR COALINGA FROM COLDWELL LANE TO MINERAL SPRINGS ROAD AND FROM 1.3 MILES EAST OF PARKFIELD JUNCTION TO 2.5 MILES WEST OF COALINGA CREEK BRIDGE06/30/20211 (03/19/2020)Details CEM-3701 Report
7414Project ID: 7414
DEA: 060M7304
EFIS: 0600020009
06-FRE-5-22.8/26.8INSTALL DOUBLE THRIE BEAM BARRIER IN THE MEDIAN.FRESNO COUNTY NEAR COALINGA FROM 1.8 MILES NORTH OF TUOLUMNE AVENUE OVERCROSSING TO 3.1 MILES SOUTH OF ROUTE 5/33 SEPARATION06/04/20131 (09/24/2012)Details CEM-3701 Report
211316Project ID: 211316
DEA: 060T6504
EFIS: 0615000220
06-FRE-5-10.0/20.0RUBBERIZED-HMA RESURFACING, REPAIR FAILED AREAS AND PANEL REPLACEMENT.FRESNO COUNTY NEAR COALINGA FROM 0.8 MILE NORTH OF GALE AVENUE UNDERCROSSING TO 1.0 MILE SOUTH OF TOULUMNE AVENUE OVERCROSSING08/30/20171 (10/04/2016)Details CEM-3701 Report
215630Project ID: 215630
DEA: 061A5304
EFIS: 0620000052
06-FRE-198-26.3/26.8COLD PLANE PAVEMENT, RESURFACE WITH HMA AND MODIFY SIGNAL.FRESNO COUNTY NEAR COALINGA FROM 0.5 MILE WEST OF ROUTE 5 TO ROUTE 198/5 SEPARATION03/02/20221 (03/29/2021)Details CEM-3701 Report
209947Project ID: 209947
DEA: 06432604
EFIS: 0600020388
06-FRE-33-10.9/11.1REPLACE BRIDGE, RECONSTRUCT ROADWAY, AND INSTALL RSP.FRESNO COUNTY NEAR COALINGA FROM 0.1 MILE WEST TO 0.1 MILE EAST OF JACALITOS CREEK BRIDGE02/17/20171 (12/29/2014)Details CEM-3701 Report
213029Project ID: 213029
DEA: 060W7304
EFIS: 0617000276
06-FRE-198-3.3/21.2HMA RESURFACING, REPAIR FAILED AREAS, AND MGS REPLACEMENT.FRESNO COUNTY NEAR COALINGA AT VARIOUS LOCATIONS FROM FRAME LANE TO FIRESTONE AVENUE12/07/2018NOT VERIFIEDDetails CEM-3701 Report
7500Project ID: 7500
DEA: 060H9404
EFIS: 0600000150
06-FRE-168-R14.4/R15.0REALIGNMENT HORIZONTAL CURVEFRESNO COUNTY NEAR CLOVIS, FROM 0.4 MILE WEST OF SHEPHERD AVENUE TO 0.3 MILE EAST OF SHEPHERD AVENUE02/04/20131 (10/10/2012)Details CEM-3701 Report