Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9891-9900 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209067 | Project ID: 209067 DEA: 060J9304 EFIS: 0600000206 | 06-FRE,KER,TUL-33,46,63,119,216,223-Var | EXTEND BOX CULVERT AND PIPE CULVERT AND CONSTRUCT HEADWALL. | FRESNO, KERN AND TULARE COUNTIES AT VARIOUS LOCATIONS | 12/19/2014 | 1 (12/19/2014) | Details CEM-3701 Report |
| 215091 | Project ID: 215091 DEA: 060T0304 EFIS: 0615000006 | 06-FRE,KER,KIN-5-Var | INSTALL VEHICLE DETECTION SYSTEM, PLACE EROSION CONTROL. | FRESNO, KERN AND KINGS COUNTIES AT VARIOUS LOCATIONS | 10/24/2022 | 1 (09/01/2020) | Details CEM-3701 Report |
| 1001165 | Project ID: 1001165 DEA: 061H6304 EFIS: 0625000097 | 06-FRE-6-43.95 | The scope of work will include culvert replacement, pavement repair, traffic control, and pavement delineation. | Fresno County, Rout I-5 at PM 43.95. | 07/11/2025 | 1 (04/11/2025) | Details CEM-3701 Report |
| 213840 | Project ID: 213840 DEA: 060X8404 EFIS: 0618000155 | 06-FRE-5,99-53.0/60.0,11.1/15.9 | COLD PLANE AC PAVEMENT AND HOT MIX ASPHALT RESURFACING. | FRESNO COUNTY ON ROUTE 5 NEAR AVENAL FROM 0.3 MILE NORTH OF RUSSELL AVENUE OVERCROSSING TO SHIELDS AVENUE OVERCROSSING AND ON ROUTE 99 IN AND NEAR FOWLER FROM MERCED STREET UNDERCROSSING TO CENTRAL AVENUE OVERCROSSING | 09/04/2019 | 1 (01/09/2019) | Details CEM-3701 Report |
| 214292 | Project ID: 214292 DEA: 060Q9004 EFIS: 0614000047 | 06-FRE-180-92.2,130.1 | REPLACE BRIDGE RAILS. | FRESNO COUNTY NEAR SQUAW VALLEY AT MILL CREEK BRIDGE AND NEAR BOYDEN CAVE AT SOUTH FORK KINGS RIVER BRIDGE | 10/29/2020 | 1 (08/05/2019) | Details CEM-3701 Report |
| 7206 | Project ID: 7206 DEA: 060N2104 EFIS: 0600020450 | 06-FRE-168-52.0/60.0 | COLD PLANE AND OVERLAY WITH HMA (TYPE A, PG-TR) | FRESNO COUNTY NEAR SHAVER LAKE FROM 2.3 MILES EAST OF HUNTINGTON LAKE ROAD TO 1.0 MILE EAST OF FLINTRIDGE ROAD | 10/23/2012 | 1 (08/27/2012) | Details CEM-3701 Report |
| 1001108 | Project ID: 1001108 DEA: 061A0904 EFIS: 0620000065 | 06-FRE-168-49.1/49.5 | SHAVER LAKE VIADUCT | FRESNO COUNTY NEAR SHAVER LAKE FROM 1.3 MILES EAST OF DALTON AVENUE TO 0.2 MILE WEST OF HUNTINGTON LAKE ROAD | 1 (03/25/2025) | Details CEM-3701 Report | |
| 3460 | Project ID: 3460 DEA: 06459904 | 06-FRE-43-0.0/9.3 | REHABILITATE PAVEMENT WITH COLD IN-PLACE RECYCLING AND HMA. | FRESNO COUNTY NEAR SELMA FROM KINGS / FRESNO COUNTY LINE TO ROUTE 99 | 11/04/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
| 213655 | Project ID: 213655 DEA: 060V9804 | 06-FRE-43-0.0/7.3 | CONSTRUCT CENTER LINE AND SHOULDER RUMBLE STRIPS. | FRESNO COUNTY NEAR SELMA FROM 0.8 MILE SOUTH OF COLE SLOUGH BRIDGE TO MOUNTAIN VIEW AVENUE | 09/06/2019 | 1 (12/27/2018) | Details CEM-3701 Report |
| 210586 | Project ID: 210586 DEA: 060M0504 EFIS: 0600000353 | 06-FRE-168-T29.0/T29.4 | REALIGN 2-LANE ROADWAY | FRESNO COUNTY NEAR PRATHER FROM 1.2 MILES WEST OF AUBERRY ROAD TO 0.8 MILE WEST OF AUBERRY ROAD | 05/17/2021 | 1 (07/21/2015) | Details CEM-3701 Report |
