Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9831-9840 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213848 | Project ID: 213848 DEA: 010J2504 EFIS: 0118000201 | 01-HUM-101-100.7/106.1 | MICRO-SURFACING AND THERMOPLASTIC DELINEATION REPLACEMENT. | HUMBOLDT COUNTY IN AND NEAR TRINIDAD FROM TRINIDAD ROAD UNDERCROSSING TO PATRICKS POINT UNDERCROSSING | 08/20/2020 | 1 (01/07/2019) | Details CEM-3701 Report |
| 214554 | Project ID: 214554 DEA: 010H3404 EFIS: 0117000162 | 01-MEN-101-55.1/64.7 | MICRO-SURFACING AND THERMOPLASTIC DELINEATION REPLACEMENT. | MENDOCINO COUNTY NEAR LONGVALE FROM 0.4 MILES SOUTH OF SHIMMINS RIDGE ROAD TO LONG VALLEY CREEK BRIDGE 10-0099 | 08/20/2020 | 1 (12/04/2019) | Details CEM-3701 Report |
| 215512 | Project ID: 215512 DEA: 010K4504 EFIS: 0120000099 | 01-HUM-101-65.5/69.9 | MICRO-SURFACING WITH CRACK TREATMENT AND TRAFFIC STRIPE TAPE. | HUMBOLDT COUNTY AT BEATRICE FROM 0.4 MILE SOUTH OF LOLETA DRIVE OVERCROSSING TO 0.7 MILE SOUTH OF TOMPKINS HILL ROAD OVERHEAD | 10/27/2021 | 1 (03/18/2021) | Details CEM-3701 Report |
| 1001099 | Project ID: 1001099 DEA: 112N1784 EFIS: 1123000070 | 11-IMP-8-R0.0R/R10.3 | MICRO-SURFACING, COLD PLANE AC PAVEMENT, PLACE HMA, AND STRIPING. | IMPERIAL COUNTY FROM IMPERIAL COUNTY LINE (R0.0R) TO 98/8 FLYOVER (R10.3) AND 98/8 INTERCHANGE | 1 (05/30/2025) | Details CEM-3701 Report | |
| 994610 | Project ID: 994610 DEA: 112N1204 EFIS: 1121000149 | 11-SD-8,15,67-VARIOUS | MICRO-SURFACING, COLD PLANE, OVERLAY, STRIPING, & SHOULDER BACKING. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS | 09/17/2024 | 1 (07/18/2023) | Details CEM-3701 Report |
| 215623 | Project ID: 215623 DEA: 010K5404 EFIS: 0120000114 | 01-HUM-101-R48.3/58.8 | MICRO-SURFACING, CRACK TREATMENT AND THERMOPLASTIC TRAFFIC STRIPE. | HUMBOLDT COUNTY NEAR SCOTIA FROM EEL RIVER BOH (RICHARD FLEISCHER MEMORIAL) TO 1.1 MILES NORTH OF ROUTE 36/101 SEPARATION | 11/01/2021 | 1 (04/07/2021) | Details CEM-3701 Report |
| 1000234 | Project ID: 1000234 DEA: 112N1774 EFIS: 1123000036 | 11-SD-15,52-Var | MICRO-SURFACING, HMA, PAVEMENT MARKING AND SHOULDER BACKING. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS | 1 (06/11/2024) | Details CEM-3701 Report | |
| 1000221 | Project ID: 1000221 DEA: 010M6804 EFIS: 0123000055 | 01-HUM-36-6.0/13.4 | MICRO-SURFACING, LOW CARBON MICRO-SURFACING, AND DELINEATION. | HUMBOLDT COUNTY NEAR CARLOTTA FROM 0.2 MILE WEST OF WILDER ROAD TO VAN DUZEN RIVER BRIDGE 04-0094 | 04/22/2025 | 1 (04/05/2024) | Details CEM-3701 Report |
| 1000261 | Project ID: 1000261 DEA: 010M6704 EFIS: 0123000054 | 01-DN-101-R27.9/31.2 | MICRO-SURFACING, PAVEMENT DELINEATION, AND REPLACE AC SURFACING. | DEL NORTE COUNTY NEAR CRESCENT CITY FROM WASHINGTON BOULEVARD OVERCROSSING TO ELK VALLEY CROSS ROAD | 03/21/2025 | 1 (04/15/2024) | Details CEM-3701 Report |
| 1001005 | Project ID: 1001005 DEA: 112N2304 EFIS: 1124000188 | 11-IMP-86-4.5/L8.5,20.4/R21.9 | MICRO-SURFACING, PAVEMENT MARKING, RUMBLE STRIP, AND SHOULDER BACKING. | IMPERIAL COUNTY IN AND NEAR EL CENTRO AND BRAWLEY FROM MCCABE ROAD TO IMPERIAL AVENUE AND FROM I STREET TO 0.3 MILE NORTH OF NEW RIVER BRIDGE | 1 (05/28/2025) | Details CEM-3701 Report |
