Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9831-9840 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6794 | Project ID: 6794 DEA: 120L2504 EFIS: 1200000390 | 12-ORA-5-28.3/29.0 | Remove HOV Buffer double yellow lines and replace with 8" white broken lines | From Tustin Ranch OC to Red Hill Ave UC in Tustin | 09/09/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 1343 | Project ID: 1343 DEA: 040120L4 EFIS: 0400000020 COOP: 042304 | 04-ALA-80-1.6/2.7 | SFOBB Runoff Mitigation | From the newly built East span of the San Francisco-Oakland Bay Bridge (SFOBB), said East span having been built as part of SFOBB Seismic Safety Project | 02/08/2018 | 1 (03/22/2011) | Details CEM-3701 Report |
| 209116 | Project ID: 209116 DEA: 040A1004 EFIS: 0400000134 COOP: 042082A1 | 04-SOL-101-34.9/47.2 | Widen Highway and include HOV lanes | From Steele Lane in Santa Rosa Road to Windsor River Road in Windsor | 05/07/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 208911 | Project ID: 208911 DEA: 06493904 EFIS: 0600000495 COOP: 061541 | 06-KER-178,58,99- | Widening 23rd and 24th Street on Rte 178 | From State Route 99 to East of M Street and intersection improvement at Oak Street in the City of Bakersfield | 08/17/2021 | 2 (07/24/2013) | Details CEM-3701 Report |
| 4226 | Project ID: 4226 MINOR: 07A2964 | 07-LA-110-24.3 | MODIFY RAMP METERING SYSTEM | FROM STADIUM WAY INTO SOUTHBOUND ROUTE 110 IN THE CITY OF LOS ANGELES | 1 (02/06/2013) | Details CEM-3701 Report | |
| 209621 | Project ID: 209621 DEA: 041J0304 EFIS: 0414000129 COOP: 042520 | 04-CC-4-var | Add Mixed Flow Lanes and Operational Improvements | From SR-4/SR-242 Interchange in Concord to SR-4/San Marcos Interchange in Pittsburg/Baypoint Area | 2 (09/09/2019) | Details CEM-3701 Report | |
| 214961 | Project ID: 214961 DEA: 113A2734 EFIS: 1112000037 MINOR: 11A3070 | 11-SD-15-26.7/27.7 | Replace tunnel lighting with LED lighting | From south of Clarence Lane Undercrossing to north of Center City Parkway Undercrossing | 1 (11/01/2016) | Details CEM-3701 Report | |
| 212517 | Project ID: 212517 DEA: 051J2404 EFIS: 0517000075 | 05-SB-101-56.0 / 57.7, 56.0/57.7 | Remove and replace damaged PCC slabs, repave shoulders and ramps, and replace striping | From Santa Rosa Road to Ave of the Flags SB off-ramp | 04/03/2018 | 1 (07/26/2017) | Details CEM-3701 Report |
| 4227 | Project ID: 4227 MINOR: 07A2991 | 07-LA-10-10.1/10.2 | Install Concrete Barrier ( Type 60) Along the right-hand shoulder eastbound Rte 10 | From Redondo Blvd Undercrossing to the existing MBGR near at La Brea Ave off ramp. | 1 (02/06/2013) | Details CEM-3701 Report | |
| 1610 | Project ID: 1610 DEA: 040A5314 EFIS: 0400000151 | 04-SOL-80-18.3/32.3 | Construction of HOV lane on Hwy I-80 | From Red Top Road to 1.4 km East of Air Base Pkwy | 07/29/2011 | NOT VERIFIED | Details CEM-3701 Report |
