Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 9831-9840 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
6794Project ID: 6794
DEA: 120L2504
EFIS: 1200000390
12-ORA-5-28.3/29.0Remove HOV Buffer double yellow lines and replace with 8" white broken linesFrom Tustin Ranch OC to Red Hill Ave UC in Tustin09/09/2016NOT VERIFIEDDetails CEM-3701 Report
1343Project ID: 1343
DEA: 040120L4
EFIS: 0400000020
COOP: 042304
04-ALA-80-1.6/2.7SFOBB Runoff MitigationFrom the newly built East span of the San Francisco-Oakland Bay Bridge (SFOBB), said East span having been built as part of SFOBB Seismic Safety Project02/08/20181 (03/22/2011)Details CEM-3701 Report
209116Project ID: 209116
DEA: 040A1004
EFIS: 0400000134
COOP: 042082A1
04-SOL-101-34.9/47.2Widen Highway and include HOV lanesFrom Steele Lane in Santa Rosa Road to Windsor River Road in Windsor05/07/2019NOT VERIFIEDDetails CEM-3701 Report
208911Project ID: 208911
DEA: 06493904
EFIS: 0600000495
COOP: 061541
06-KER-178,58,99-Widening 23rd and 24th Street on Rte 178From State Route 99 to East of M Street and intersection improvement at Oak Street in the City of Bakersfield08/17/20212 (07/24/2013)Details CEM-3701 Report
4226Project ID: 4226
MINOR: 07A2964
07-LA-110-24.3MODIFY RAMP METERING SYSTEMFROM STADIUM WAY INTO SOUTHBOUND ROUTE 110 IN THE CITY OF LOS ANGELES 1 (02/06/2013)Details CEM-3701 Report
209621Project ID: 209621
DEA: 041J0304
EFIS: 0414000129
COOP: 042520
04-CC-4-varAdd Mixed Flow Lanes and Operational ImprovementsFrom SR-4/SR-242 Interchange in Concord to SR-4/San Marcos Interchange in Pittsburg/Baypoint Area 2 (09/09/2019)Details CEM-3701 Report
214961Project ID: 214961
DEA: 113A2734
EFIS: 1112000037
MINOR: 11A3070
11-SD-15-26.7/27.7Replace tunnel lighting with LED lightingFrom south of Clarence Lane Undercrossing to north of Center City Parkway Undercrossing 1 (11/01/2016)Details CEM-3701 Report
212517Project ID: 212517
DEA: 051J2404
EFIS: 0517000075
05-SB-101-56.0 / 57.7, 56.0/57.7Remove and replace damaged PCC slabs, repave shoulders and ramps, and replace stripingFrom Santa Rosa Road to Ave of the Flags SB off-ramp04/03/20181 (07/26/2017)Details CEM-3701 Report
4227Project ID: 4227
MINOR: 07A2991
07-LA-10-10.1/10.2Install Concrete Barrier ( Type 60) Along the right-hand shoulder eastbound Rte 10From Redondo Blvd Undercrossing to the existing MBGR near at La Brea Ave off ramp. 1 (02/06/2013)Details CEM-3701 Report
1610Project ID: 1610
DEA: 040A5314
EFIS: 0400000151
04-SOL-80-18.3/32.3Construction of HOV lane on Hwy I-80From Red Top Road to 1.4 km East of Air Base Pkwy07/29/2011NOT VERIFIEDDetails CEM-3701 Report