Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9811-9820 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212911 | Project ID: 212911 DEA: 081F9404 EFIS: 0815000067 | 08-RIV-79-R4.7/R10.6 | COLD PLANE, OVERLAY WITH RUBBERIZED HOT MIX ASPHALT (TYPE G) | RIVERSIDE COUNTY FROM 0.1 MILE SOUTH OF MURRIETA HOT SPRINGS ROAD TO 0.1MILE NORTH OF ABELIA ROAD | 06/23/2021 | 1 (12/28/2018) | Details CEM-3701 Report |
| 212912 | Project ID: 212912 DEA: 010H6904 EFIS: 0118000074 | 01-DN-101-15.1/15.5, 15.1 - 15.5 | Roadway stabilization & retaining wall repair | 07/15/2021 | 1 (01/26/2018) | Details CEM-3701 Report | |
| 212913 | Project ID: 212913 DEA: 071XG004 EFIS: 0718000157 | 07-VEN-150-20, 10.16, PM 20.16 | Replace the existing reinforced concrete box with a precast reinforced concrete box and repair roadway | 06/03/2020 | 1 (01/11/2018) | Details CEM-3701 Report | |
| 212914 | Project ID: 212914 DEA: 031E0604 EFIS: 0312000068 | 03-YUB-70-15.5/16.5 | SIMMERLY SLOUGH BRIDGE REPLACEMENT BR 16-0019 WITH BR 16-0055. | NEAR MARYSVILLE, FROM 0.1 MILE NORTH OF BINNEY JUNCTION UNDERPASS TO 0.3 MILE NORTH OF LAURELLEN ROAD, AT SIMMERLY SLOUGH BRIDGE BR 16-0019. | 08/30/2023 | 1 (08/22/2019) | Details CEM-3701 Report |
| 212915 | Project ID: 212915 DEA: 060W5504 EFIS: 0618000082 MINOR: 06A2416 | 06-MAD-99-R6.9/R8.2 | Install flashing beacon and materials , perform emergency | 08/31/2023 | 1 (01/09/2018) | Details CEM-3701 Report | |
| 212916 | Project ID: 212916 DEA: 051J2004 | 05-SBT-101-R4.6/R6.9 | COLD PLANE AND PLACE RHMA OVERLAY ON RAMPS | SAN BENITO COUNTY ABOUT 9 MILES SOUTH OF GILROY FROM 0.3 MILE SOUTH TO 0.2 MILE NORTH OF ROUTE 101/129 SEPARATION AND FROM 0.3 MILE SOUTH TO 0.4 MILE NORTH OF LOMERIAS OVERCROSSING | 09/24/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 212917 | Project ID: 212917 DEA: 072975U4 EFIS: 0716000144 | 07-LA-110-24.0/30.4 | CONCRETE BARRIER, CONCRETE PAVEMENT, DRAINAGE AND ELECTRICAL WORK. | LOS ANGELES COUNTY IN LOS ANGELES AND SOUTH PASADENA FROM COLLEGE STREET OVERCROSSING TO GRAND AVENUE OVERCROSSING | 10/06/2022 | 1 (01/14/2019) | Details CEM-3701 Report |
| 212918 | Project ID: 212918 DEA: 09370504 | 09-INY,MNO-395-45.5/53.0,6.9/65.1 | CONSTRUCT POLYMER MODIFIED EMULSION CHIP SEAL. | INYO COUNTY FROM 0.7 MILE SOUTH OF COTTONWOOD ROAD TO 0.3 MILE SOUTH OF LUBKIN CANYON ROAD AND IN MONO COUNTY FROM 2.4 MILES SOUTH OF LOWER ROCK CREEK ROAD TO 1.6 MILES NORTH OF VIRGINIA LAKES ROAD | 06/23/2021 | 1 (06/23/2021) | Details CEM-3701 Report |
| 212919 | Project ID: 212919 Permit Numbers: 0715NSN1269 | 07--- | 06/17/2021 | 1 (06/17/2021) | Details CEM-3701 Report | ||
| 212920 | Project ID: 212920 Permit Numbers: 10176MC0280 10186DP0026 10186RW0115 | 10---26.7/26.8 | Install new curb, gutter, sidewalk, a commercial driveway approach, and pavement widening along the southwest corner of Pelandale/Claratina/State Route 108 intersection in the City of Modesto. Other works includes a new pedestrian island, traffic signal modification, and a new horizontal drain. All | SR 108, Modesto | 01/22/2020 | 1 (11/28/2017) | Details CEM-3701 Report |
