Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9811-9820 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210790 | Project ID: 210790 DEA: 044H3604 EFIS: 0413000212 COOP: 042956 | 04-SM-101-20.7/21.7 | Extend Utah Avenue to the west over US 101 to connect with San Mateo Avenue and improve the southbound on and off ramp accesses from and to the area | Utah Avenue to the west over US 101 & San Mateo Avenue | 2 (09/05/2017) | Details CEM-3701 Report | |
| 210791 | Project ID: 210791 DEA: 010E6604 MINOR: 01A1559 | 01-HUM-101-97.7/100.7 | 12/21/2020 | 1 (09/23/2015) | Details CEM-3701 Report | ||
| 210792 | Project ID: 210792 DEA: 021H9604 | 02-SIS,SIS/SHA/THE-5-VAR | Upgrade irrigations systems with SMART irrigations technology to maximize water conservation | On I-5 at Various locations | 12/14/2017 | 2 (09/23/2015) | Details CEM-3701 Report |
| 210793 | Project ID: 210793 DEA: 044J7204 | 04-SON-101-3.65, 3.65 | Repair joint seals | 12/18/2017 | NOT VERIFIED | Details CEM-3701 Report | |
| 210794 | Project ID: 210794 DEA: 062HT104 EFIS: 0612000287 | 06-FRE-99-23.5/26.7 | (Alternative Delivery) Realign Freeway CONTACT SMR PRIOR TO PERFORMING ANY TESTING OR INSPECTION. CMGC PROJECT. Realign Route 99 between Ashlan Avenue and Olive Avenue to accommodate the High Speed Train (HST). | State Highway 99 in Fresno (Fresno County) from 0.2 miles North of Olive Ave over-crossing to 0.2 miles North of Ashlan Ave over-crossing. | 09/16/2020 | 1 (10/01/2015) | Details CEM-3701 Report |
| 210795 | Project ID: 210795 DEA: 01497714 EFIS: 0100020262 | 01-MEN-1-2.4 | PERMANENT RESTORATION SLIPOUT/REPAIR DRAINAGE | PERMANENT RESTORATION SLIPOUT/REPAIR DRAINAGE | 02/16/2017 | 1 (09/23/2015) | Details CEM-3701 Report |
| 210796 | Project ID: 210796 DEA: 024G8204 EFIS: 0214000063 | 02-SIS-5-R10.7/R19.5 | COLD PLANE, PLACE HMA | 04/06/2018 | 1 (09/23/2015) | Details CEM-3701 Report | |
| 210797 | Project ID: 210797 DEA: 030F3704 EFIS: 0312000075 | 03-GLE-5-R24.8/R28.6 | LOWER ROADWAY PROFILE TO IMPROVE VERTICAL CLEARANCE. | IN GLENN COUNTY NEAR ORLAND AT VARIOUS LOCATIONS FROM COUNTY ROAD 16 OVERCROSSING TO COUNTY ROAD 3OVERCROSSING | 01/17/2017 | 1 (10/20/2015) | Details CEM-3701 Report |
| 210798 | Project ID: 210798 DEA: 030G0304 EFIS: 0314000027 | 03-ED,PLA-50,80,193-VAR | RESURFACE BRIDGE DECKS, JOINT SEALS, CONCRETE BARRIER AND SLABS. | IN EL DORADO AND PLACER COUNTIES ATVARIOUS LOCATIONS (FED SPES NUMBER 00PE015) | 11/30/2017 | 1 (10/20/2015) | Details CEM-3701 Report |
| 210799 | Project ID: 210799 DEA: 034F0204 EFIS: 0314000010 | 03-PLA-65-R4.8/R12.2 | RHMA-O (OGFC) AND HMA-A OVERLAY. | IN PLACER COUNTY FROM ROUTE 65/80 SEPARATION IN ROSEVILLE TO 0.3 MILENORTH OF TWELVE BRIDGES DRIVEOVERCROSSING IN LINCOLN | 10/28/2016 | 1 (10/20/2015) | Details CEM-3701 Report |
