Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9811-9820 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7083 | Project ID: 7083 EFIS: 0000001155 Permit Numbers: 0512NDP0026 | 05-SLO-101-29.76/29.79 | Construct new signal at Grand Avenue and northbound exit ramp | Grand Avenue, San Luis Obispo | 09/18/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 209694 | Project ID: 209694 DEA: 080J0704 EFIS: 0800000282 | 08-SBD-215-0.6/1.7 | (Alternative Delivery) The CMGC project will reconstruct and improve interchange of I-215 and Barton Road in the City of Grand Terrace, CA. | Grade separation at Intersection of I-215 and Barton Road near Grand Terrace, CA. ? On I-215 between I-10 and SR-60. | 04/23/2020 | 1 (12/11/2017) | Details CEM-3701 Report |
| 3654 | Project ID: 3654 EFIS: 0000001155 Permit Numbers: 07086MC1785 | 07-VEN-1-12.62/12.82 | Remove & replace commercial approaches, modify intersection curb return and drainage connection. | Gonzales Road, Oxnard | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 215514 | Project ID: 215514 DEA: 031G7204 EFIS: 0319000235 | 03-GLE,SAC,SUT,YOL-5,16,50,80,99,160-VAR | JOINT SEAL AND STRUCTURE APPROACH REPLACEMENT AND DECK OVERLAY. | GLENN, SACRAMENTO, SUTTER, AND YOLO COUNTIES AT VARIOUS LOCATIONS | 11/23/2022 | 1 (03/08/2021) | Details CEM-3701 Report |
| 214082 | Project ID: 214082 DEA: 034H0204 EFIS: 0318000128 | 03-GLE,PLA,SAC,YOL-5,16,45,49,50,etc.-VAR | MODIFY ELECTRICAL SYSTEM & PLACE TRAFFIC MONITORING SYSTEM. | GLENN, PLACER, SACRAMENTO, AND YOLO COUNTIES AT VARIOUS LOCATIONS | 07/25/2022 | 1 (04/29/2019) | Details CEM-3701 Report |
| 208691 | Project ID: 208691 DEA: 034M5504 EFIS: 0312000110 | 03-GLE-162-67.2/76.3,76.3/84.6 | REPLACE AC SURFACING, APPLY MOD EMULSION SEAL COAT AND TRAFFIC STRIPES. | GLENN COUNTY NEAR WILLOWS FROM CENTRAL IRRIGATIONAL CANAL BRIDGE TO NORTH JUNCTION ROUTE 162/45 AND FROM SOUTH JUNCTION ROUTE 162/45 TO BUTTE COUNTY LINE | 10/08/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 214642 | Project ID: 214642 DEA: 031G6704 EFIS: 0319000117 | 03--- | COLD PLANE AC PAVEMENT AND RHMA-G OVERLAY. | GLENN COUNTY NEAR WILLOWS FROM 2.3 MILES EAST OF NYE CREEK BRIDGE TO 0.2 MILE WEST OF ROUTE 162/5 SEPARATION | 01/13/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
| 1000699 | Project ID: 1000699 DEA: 032J5904 EFIS: 0322000068 | 03-GLE-32-2.8/3.2 | INSTALL TRAFFIC SIGNAL. | GLENN COUNTY NEAR ORLAND FROM 0.2 MILE WEST TO 0.2 MILE EAST OF COUNTY ROAD P | 1 (12/18/2024) | Details CEM-3701 Report | |
| 1117 | Project ID: 1117 DEA: 033C8704 | 03-GLE-5-R20.0/R28.8 | PLACE RUBBERIZED HMA | Glenn County near Orland from 0.2 mile North of County Road 28 Overcrossing to Tehama County Line. | 03/23/2010 | 1 (03/23/2010) | Details CEM-3701 Report |
| 994555 | Project ID: 994555 DEA: 032G7504 EFIS: 0322000154 | 03-GLE-45-7.0/23.2 | FULL AND PARTIAL DEPTH RECYCLING, PLACE RHMA. | GLENN COUNTY NEAR HAMILTON CITY FROM 4.4 MILES SOUTH TO 1.4 MILES NORTH OF BAYLISS BLUE GUM ROAD AND FROM 3.5 MILES SOUTH TO 2.5 MILES NORTH OF STONY CREEK BRIDGE | 01/22/2025 | 1 (05/15/2023) | Details CEM-3701 Report |
