Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9791-9800 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214879 | Project ID: 214879 DEA: 044Q1404 EFIS: 0419000351 | 04-SM-1-37.7/37/7, 37.70 | Secant Pile Wall | Highway 1 just south of Grey Whale Cove | 12/16/2021 | 1 (04/01/2020) | Details CEM-3701 Report |
| 209294 | Project ID: 209294 DEA: 051C7704 EFIS: 0512000233 MINOR: 05A1670 | 05-MON-1-R85.2/R88.2 | Fence Reconstruction | HIGHWAY 1 IN MONTEREY COUNTY IN AND NEAR MARINA FROM SOUTH MARINA OVERHEAD TO NEPONSET OVERCROSSING | 03/20/2020 | 1 (01/27/2014) | Details CEM-3701 Report |
| 212164 | Project ID: 212164 DEA: 051J1304 EFIS: 0517000064 | 05-MON,MON-1-45.52, 45.4/45.8 | Pfeiffer Canyon Emergency Bridge Replacement Project | Highway 1 at Pfeiffer State Park | 10/25/2019 | 1 (02/27/2017) | Details CEM-3701 Report |
| 4670 | Project ID: 4670 EFIS: 0000001155 Permit Numbers: 08066MC0831 08076RW1174 | 08-SBD-330-29.389/29.389 | Enter onto State Right of Way at SR-330 southbound On-ramp and Highland Ave in the City of Highland to construct a retaining wall, as per plans date stamped 4/24/2007 by the Department of Transportation, District 8 Permit Office, and/or as directed by the | Highland Ave., Highland | 02/01/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 210522 | Project ID: 210522 Permit Numbers: 0412NMC1020 0414NRD0754 0414NRD1882 0415NRT0829 | 04-MRN-101-11.25/11.25 | Perform construction of pedestrian and bicycle improvements on Hetherton St. between Mission Ave. and Fourth St. new curb, gutter, concrete sidewalk, and a 10-inch wide multi-use path along with storm drain improvements, irrigation and landscaping improvements, traffic signal modifications and inst | Hetherton Street , San Rafael | 09/14/2018 | 1 (05/14/2015) | Details CEM-3701 Report |
| 214780 | Project ID: 214780 Permit Numbers: 0419NSN0548 0419NSN1839 | 04---10.89 | Encroach within State's right-of-way to modify existing traffic signal, install conduits, traffic signal poles, video detection camera & cable, CCTV camera, curb ramps, and striping & signing at the intersection Hetherton Street/3nd Street, on the Highway, 04-MRN-101, Post Mile 10.89, in | Hetherton St., San Rafael | 08/23/2021 | 1 (03/03/2020) | Details CEM-3701 Report |
| 215207 | Project ID: 215207 Permit Numbers: 0420NMC0200 | 04-ALA--20.03 | Remove traffic signal pole within Caltrans ROW Install new pole outside Caltrans ROW Install conduits connecting new traffic signals Replace concrete sidewalk Install new accessible ramps, curb/gutter HMA paving Replace concrete striping | Hesperian Blvd, San Lorenzo | 10/14/2022 | 1 (10/01/2020) | Details CEM-3701 Report |
| 210660 | Project ID: 210660 DEA: 044J4304 EFIS: 0415000347 | 04-SM-101-3.046 | Reconstruct pump system and repair pump station | Henderson Pump House,0.5 mile north of SC County line | 12/27/2017 | 1 (09/17/2015) | Details CEM-3701 Report |
| 209515 | Project ID: 209515 DEA: 080N3604 EFIS: 0800000526 | 08-RIV-74-34.8/35.9 | Roadway Widening | Hemet | 08/19/2021 | 1 (09/21/2016) | Details CEM-3701 Report |
| 994751 | Project ID: 994751 DEA: 010C5004 EFIS: 0112000292 | 01-HUM-36-11.3/34.6 | Project Name: Bridge Rail Replacement - 3 Bridges | Hely Creek, Little Larabee Creek and Butte Creek Bridge. | 1 (04/27/2023) | Details CEM-3701 Report |
