Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9781-9790 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214711 | Project ID: 214711 DEA: 010J5004 EFIS: 0119000047 | 01-DN-199-R22.1/36.4 | MICROSURFACING, REPLACE AC SURFACING AND THERMOPLASTIC STRIPE. | DEL NORTE COUNTY NEAR PATRICK CREEK FROM PATRICK CREEK BRIDGE TO OREGON STATE LINE | 08/25/2020 | 1 (06/04/2020) | Details CEM-3701 Report |
| 994724 | Project ID: 994724 DEA: 010M0804 EFIS: 0122000084 | 01-HUM-255-0.5/8.6 | MICROSURFACING, REPLACE AC SURFACING, AND MODIFY SIGNAL SYSTEMS. | HUMBOLDT COUNTY IN EUREKA FROM 0.3 MILE NORTH OF EUREKA CHANNEL BRIDGE TO G STREET IN ARCATA | 01/22/2024 | 1 (04/25/2023) | Details CEM-3701 Report |
| 994609 | Project ID: 994609 DEA: 112N1194 EFIS: 1121000148 | 11-SD-94-14.9/29.2 | MICROSURFACING, RUMBLE STRIP, PAVEMENT MARKING, & SHOULDER BACKING. | SAN DIEGO COUNTY NEAR JAMUL FROM JUNCTION ROUTE 54/94 TO 0.7 MILE EAST OF DULZURA CREEK | 05/06/2025 | 1 (08/23/2023) | Details CEM-3701 Report |
| 995065 | Project ID: 995065 DEA: 112N1764 | 11-IMP-8-R50.3/R96.7 | MICROSURFACING, SHOULDER BACKING, PAVEMENT MARKING, & INSTALL SIGNS. | IMPERIAL COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF BONDS CORNER OVERCROSSING TO 0.2 MILE EAST OF FOURTH AVENUE OVERCROSSING . | 1 (06/11/2024) | Details CEM-3701 Report | |
| 994611 | Project ID: 994611 DEA: 112N1214 EFIS: 1121000171 | 11-SD-94-39.0/R49.9 | MICROSURFACING, SHOULDER BACKING, RUMBLE STRIP, & STRIPING. | SAN DIEGO NEAR POTRERO AND CANYON CITY FROM JUNCTION ROUTE 188 TO 3 MILES EAST OF CAMPO CREEK BRIDGE (BR NO. 57-0118) | 06/11/2024 | 1 (07/18/2023) | Details CEM-3701 Report |
| 993694 | Project ID: 993694 DEA: 010L0004 EFIS: 0121000040 | 01-HUM-299-R22.5/R30.7 | MICROSURFACING. | HUMBOLDT COUNTY FROM REDWOOD CREEK BRIDGE TO 1.6 MILES EAST OF TITLOW HILL ROAD | 09/21/2023 | 1 (04/19/2022) | Details CEM-3701 Report |
| 215097 | Project ID: 215097 DEA: 11429704 EFIS: 1117000102 | 11-SD-5,8,15,52,56,etc.-Var | MICROWAVE VEHICLE DETECTION SYSTEMS, COLD PLANE AND RHMA OVERLAY. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS | 03/05/2024 | 1 (11/20/2020) | Details CEM-3701 Report |
| 993126 | Project ID: 993126 DEA: 044K0404 EFIS: 0417000246 | 04-SM-1-31.2/32.0 | Mid-coast Multi-modal Trail Improvements Project | SR 1 (PM 31.2/32.0) east of highway, from Mirada Road to Coronado Street in San Mateo County within El Granada | 08/30/2023 | 2 (07/12/2021) | Details CEM-3701 Report |
| 210161 | Project ID: 210161 DEA: 031E0901 EFIS: 0312000116 | 03-BUT-162- | MIDDLE FORK FEATHER RIVER BRIDGE -Bidwell Bar Bridge | Lake Oroville | 1 (02/05/2015) | Details CEM-3701 Report | |
| 1001336 | Project ID: 1001336 DEA: 033J3604 EFIS: 0322000266 | 03--- | Middle Mile Broadband | 1 (06/17/2025) | Details CEM-3701 Report |
