Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9761-9770 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1734 | Project ID: 1734 DEA: 040G7804 | 04-NAP-29-6.99 | REPLACE STEEL FINGER JOINT ASSEMBLY | Hinge 2, westbound, Hwy 29 Napa River Bridge | 06/08/2011 | 1 (04/29/2011) | Details CEM-3701 Report |
| 212200 | Project ID: 212200 Permit Numbers: 04176DP0138 0414NMC2078 | 04--680-14.8/14.8 | Remove concrete curb and gutter. | Hillside Ave, Walnut Creek | 02/03/2020 | 1 (03/13/2017) | Details CEM-3701 Report |
| 7541 | Project ID: 7541 DEA: 041G9414 EFIS: 0400021104 Permit Numbers: 0412NMC1060 0413NRD0313 | 04-CC-4-28.6/30.5 | This project will widen SR4 from to eight lanes,plus auxiliary lanes,in each direction with concrete pavement from Hillcrest Avenue to SR 160. | Hillcrest Ave / SR4 Interchange, Antioch | 11/04/2016 | 2 (12/10/2012) | Details CEM-3701 Report |
| 214534 | Project ID: 214534 EFIS: 0000020505 Permit Numbers: 1117NUJ0616 | 11--94-2.35 | Enter upon State Highway right of way in San Diego County, City of San Diego, on Route 94, post mile 2.35, to abandon an existing 10-inch sewer pipe and install a 15-inch PVC sewer pipe within a 36-inch steel casing by the jack and bore method. | HIGHWAY 94 BETWEEN 29TH STREET AND 30TH STREET. 500+/- WEST OF 30TH STREET. | 1 (10/28/2019) | Details CEM-3701 Report | |
| 7452 | Project ID: 7452 EFIS: 0000001155 Permit Numbers: 05126SE0197 | 05-SCR-9-5.79/6.46 | Detour highway traffic onto local roads for Felton Remembers Parade on May 28, 2012 from 9:30 AM to 12 Noon | Highway 9, Felton | 09/18/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 2526 | Project ID: 2526 EFIS: 0000001155 Permit Numbers: 05096UL0263 | 05-SCL-9-0.18/2.91 | Place 4-inch conduit along highway to replace overhead poles and cables in State right of way; 4-inch conduit will allow 3 1-1/4-inch inner ducts for broadband cable. | Highway 9, Boulder Creek | 04/29/2011 | NOT VERIFIED | Details CEM-3701 Report |
| 993305 | Project ID: 993305 Permit Numbers: 04216US0226 | 04-SCL-880-7.4/7.5 | PG&E has a project coming up where we will be retiring in place a gas transmission pipeline under state highway 880. This pipeline needs to be retired in place rather than removed due to trenching across the highway would leave a big patch as well as causing severe traffic disruptions. Instead | Highway 880, Milpitas | 06/22/2022 | 1 (10/07/2021) | Details CEM-3701 Report |
| 209709 | Project ID: 209709 EFIS: 1013000067 MINOR: 10A1615 | 10-AMA-88- | Cured in Place Pipelines and Replace Culvert | Highway 88 in Amador County at Various Locations | 12/06/2019 | 1 (07/11/2014) | Details CEM-3701 Report |
| 1001900 | Project ID: 1001900 DEA: 041X1804 EFIS: 0424000264 | 04-CC-80,680-various | Install trash capture devices | Highway 80/680 | NOT VERIFIED | Details CEM-3701 Report | |
| 994307 | Project ID: 994307 DEA: 033J8404 EFIS: 0323000021 | 03-PLA-80-64/67 | Roadlock pilot project for I-80 Chain wear rutting | Highway 80 | 1 (09/29/2022) | Details CEM-3701 Report |
