Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9711-9720 of 19352 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210607 | Project ID: 210607 DEA: 120N5704 EFIS: 1214000062 MINOR: 12A1591 | 12--405-11.68 | MODIFY SIGNALS, REPLACE MISSING SIGNS ON THE NOSE OF MEDIAN ISLANDS, RELOCATE THE MEDIAN NOSE OF HARBOR BLVD 25 FEET TO THE NORTH, AND REFRESH PAVEMENT DELINEATION ON EACH SIDE OF THE INTERSECTION. | IN ORANGE COUNTY, IN COSTA MESA, AT SOUTHBOUND I-405. | 07/01/2016 | 1 (08/06/2015) | Details CEM-3701 Report |
| 210612 | Project ID: 210612 DEA: 043G7104 EFIS: 0412000156 | 04-ALA-238,580,680,880-Various | CONSTRUCT ROADSIDE PAVING AND MAINTENANCE VEHICLE PULLOUT | ALAMEDA COUNTY AT VARIOUS LOCATIONS | 08/21/2018 | 1 (09/21/2015) | Details CEM-3701 Report |
| 210614 | Project ID: 210614 DEA: 11261634 | 11--- | 1 (06/22/2015) | Details CEM-3701 Report | |||
| 210615 | Project ID: 210615 MINOR: 11A2306 | 11--8-R30.70/R31.36 | 1 (07/09/2015) | Details CEM-3701 Report | |||
| 210616 | Project ID: 210616 DEA: 043G8304 EFIS: 0413000198 COOP: 042585 | 04-CC-239-NEW | Construct a new multimodal transportation alignment connecting State Route (SR) 4 just south of Balfour Road, in Brentwood, to the existing Interstate 580 and Interstate 205 interchange | In eastern Alameda County | 2 (11/04/2019) | Details CEM-3701 Report | |
| 210617 | Project ID: 210617 DEA: 042J1004 EFIS: 0414000426 COOP: 042549 | 04-NAP-29-11.3/11.6 | CONSTRUCT TWO SEPARATE ROUNDABOUT PROJECTS TOGETHER INTO ONE SINGLE PROJECT AND CONSTRUCTION CONTRACT. | AT THE INTERSECTIONS OF FIRST STREET/ CALIFORNIA BLVD AND SECOND STREET/CALIFORNIA BLVD (CITY) AND AT HE STATE ROUTE 29 NORTHBOUND ON AND OFF RAMPS AND FIRST STREET ( CALTRANS) | 09/28/2021 | 1 (08/19/2019) | Details CEM-3701 Report |
| 210618 | Project ID: 210618 DEA: 06342534 EFIS: 0600000382 COOP: 061616A2 | 06-FRE-180-R74.1/R78.6 | CONSTRUCT SEGMENT 3 OF KINGS CANYON EXPRESSWAY | FRESNO COUNTY ABOUT 8.4 MILES EAST OF FRESNO FROM 0.7 MILE WEST OF SMITH AVENUE TO 0.7 MILE EAST OF FRANKWOOD AVENUE | 07/06/2021 | 1 (07/10/2017) | Details CEM-3701 Report |
| 210619 | Project ID: 210619 DEA: 01496304 EFIS: 0100000494 MINOR: 01A1563 | 01-HUM-211-R77.3/78.6 | INSTALL BICYCLE WARNING SIGNS AND HIGHWAY LIGHTING | IN HUMBOLDT COUNT Y NEAR FERN BR IDGE 0.2 MILES SOUTH TO 0.2 MIL ES NORTH O F THE EEL RIVER BR IDGE NO . 04-134 | 12/21/2020 | 1 (07/31/2015) | Details CEM-3701 Report |
| 210620 | Project ID: 210620 EFIS: 1013000197 MINOR: 10A1713 | 10--4- | Drainage System Restoration and HMA Overlay | COPPEROPOLIS | 12/06/2019 | 2 (07/06/2015) | Details CEM-3701 Report |
| 211022 | Project ID: 211022 DEA: 100T8104 | 10-MER-59,99,140,152-Varies | CONSTRUCTION OF ADA CURB RAMPS. | IN MERCED COUNTY ON STATE ROUTES 59, 99, 140 AND 152 AT VARIOUS | 11/07/2016 | 1 (02/17/2016) | Details CEM-3701 Report |
