Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 9661-9670 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
994854Project ID: 994854
DEA: 061E5804
EFIS: 0622000071
06-KER-43,46-9.0/15.7, 20.0/27.5FOR CONSTRUCTION ON STATE HIGHWAY IN KERN COUNTY NEAR WASCO ON ROUTE 43 FROM 0.2 MILE SOUTH OF ROUTE 58 TO 0.5 MILE NORTH OF RIVERSIDE AVENUE AND ROUTE 46 FROM 0.5 MILE WEST OF ROUTE 33 TO HOLLOWAY ROADIn District 06 On Route 43, 4611/16/20231 (06/14/2023)Details CEM-3701 Report
994845Project ID: 994845
DEA: 061E6104
EFIS: 0622000068
06-TUL-63-2.0/4.0FOR CONSTRUCTION ON STATE HIGHWAY IN TULARE COUNTY NEAR VISALIA FROM EAST CARTMILL AVENUE TO AVENUE 264In District 06 On Route 6302/26/20241 (06/14/2023)Details CEM-3701 Report
993518Project ID: 993518
DEA: 074P9204
EFIS: 0719000351
MINOR: 07A5052
07-VEN-VEN 101-4.9For Construction On State Highway In VENTURA COUNTY, NORTHBOUND VEN 101 TO LYNN ROAD POSTMILE 4.9, TO REPLACE EXISTING LYNN ROAD EXIT SIGN AND REPLACE METAL BEAM GUARDRAIL WITH MIDWEST GUARDRAIL AND TERMINAL SYSTEM.In District 07 On Route 101 1 (01/20/2022)Details CEM-3701 Report
1001539Project ID: 1001539
EFIS: 1124000336
MINOR: 11A4124
11---Upgrade Signing and StripingIn District 11 On Route 5 1 (08/25/2025)Details CEM-3701 Report
213471Project ID: 213471
DEA: 120N9804
EFIS: 1215000016
MINOR: 12A1716
12-ORA-55-R5.8FOR CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY IN THE CITY OF COSTA MESA, AT 0.2 MILES SOUTH OF ROUTE 55/405 SEPARATIONIn District 12 On Route 5507/01/20241 (07/02/2018)Details CEM-3701 Report
10022Project ID: 10022
DEA: 010C8004
EFIS: 0113000059
01-DN-197-2.12Repair SinkholeIn DN County, at 2.1 miles north of the intersection of Highway 199 and 19701/02/20151 (01/23/2013)Details CEM-3701 Report
210616Project ID: 210616
DEA: 043G8304
EFIS: 0413000198
COOP: 042585
04-CC-239-NEWConstruct a new multimodal transportation alignment connecting State Route (SR) 4 just south of Balfour Road, in Brentwood, to the existing Interstate 580 and Interstate 205 interchangeIn eastern Alameda County 2 (11/04/2019)Details CEM-3701 Report
7049Project ID: 7049
DEA: 034E6604
EFIS: 0300020173
MINOR: 03A1904
03-ED-49-33.6Remove SlopeIn ED County , near Cool at Cave Valley Rd06/18/20202 (12/05/2014)Details CEM-3701 Report
1037Project ID: 1037
DEA: 032F1004
EFIS: 0300020500
03-ED-193-23.45/23.75At Location 1 replace failed pavement ; At Location 2 place retaining system and replace pavementIn ED County near Kelsey , from 2.7 miles east of Kelsey to 0.8mile west of South Fork American River06/18/20201 (11/18/2010)Details CEM-3701 Report
210060Project ID: 210060
DEA: 030H1304
EFIS: 0315000079
03-ED-50,050-36.77Culvert RepairIn ED County near Pollock Pines on Route 50 at Bridal Veil Falls12/08/20171 (01/02/2015)Details CEM-3701 Report