Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9651-9660 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210859 | Project ID: 210859 DEA: 010B3104 EFIS: 0112000115 | 01-DN-199-8.7,21.7 | CONSTRUCT BUTTRESSES | IN DEL NORTE COUNTY NEAR GASQUET AT1.6 MILES NORTH OF MYRTLE CREEK BRIDGE AND ABOUT 8 MILES NORTH OF GASQUET AT 0.4 MILE SOUTH OF PATRICK CREEK BRIDGE | 02/16/2017 | 1 (09/23/2015) | Details CEM-3701 Report |
| 10 | Project ID: 10 DEA: 010A1604 EFIS: 0100020021 | 01-DN-101-7.6/8.69 | Roadway Repair | In Del Norte County Near Klamath , 3.56 miles North to 4.65 miles North of the Klamath River Bridge | 05/24/2011 | 1 (05/24/2011) | Details CEM-3701 Report |
| 211256 | Project ID: 211256 DEA: 010G1004 | 01-DN-101-12.5/15.5, 12.5/15/5 | Roadway Stabilization & Retaining Wall Repair | In Del Norte County near Klamath from 0.4 mile south of Wilson Creek Bridge to 1.7 miles north of Rudisill Road | 07/13/2021 | 1 (12/16/2016) | Details CEM-3701 Report |
| 47 | Project ID: 47 DEA: 01311714 | 01-DN-169- 2.3 | REPLACE BRIDGE | IN DEL NORTE COUNTY NEAR KLAMATHGLEN FROM 3.7 KM EAST OF ROUTE101 AND 169 SEPARATION TO 0.5 KMEAST OF TERWER CREEK BRIDGE | 11/10/2010 | 1 (05/12/2006) | Details CEM-3701 Report |
| 77 | Project ID: 77 DEA: 01409604 | 01-DN-199-27.0 | CURVE REALIGNMENT | IN DEL NORTE COUNTY NEAR PATRICKCREEK FROM 1.7 KM TO 0.9 KM SOUTH OF IDLEWILD MAINTENANCE STATION ROAD | 11/10/2010 | 1 (07/14/2008) | Details CEM-3701 Report |
| 323 | Project ID: 323 DEA: 01491404 | 01-DN-101-39.6/43.7 | INSTALL RUMBLE STRIPS AND WIDEN SHOULDERS | IN DEL NORTE COUNTY NEAR SMITH RIVER FROM ROWDY CREEK BRIDGE TO 0.5 MILE SOUTH OF MARANDA LANE | 11/04/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
| 39 | Project ID: 39 DEA: 01293134 | 01-DN-101-35.8 | WIDEN ROADWAY AND BRIDGES | IN DEL NORTE COUNTY NORTH OFCRESCENT CITY AT SMITH RIVEROVERFLOW BRIDGE AND AT GILBERTCREEK BRIDGE | 03/11/2011 | 1 (08/06/2007) | Details CEM-3701 Report |
| 2404 | Project ID: 2404 DEA: 044R2704 MINOR: 04A2330 | 04-SCL-101-R16.4 | COLD PLANE AC | IN DEL NORTE COUNTY NORTH OFCRESCENT CITY AT SMITH RIVEROVERFLOW BRIDGE AND AT GILBERTCREEK BRIDGE | 03/23/2020 | 2 (08/22/2019) | Details CEM-3701 Report |
| 210286 | Project ID: 210286 DEA: 010E5404 EFIS: 0114000098 | 01-DN-VAR-VAR | Replace leaking water storage tanks and upgrade plumbing features to water conservation standards | In Del Norte,, Humboldt, Mendocino and Lake Counties at various maintenance stations and rest areas | 04/27/2018 | 2 (09/23/2015) | Details CEM-3701 Report |
| 209444 | Project ID: 209444 DEA: 044S0704 EFIS: 0400001204 MINOR: 04A4313 | 04-SCL-101-5.1 | Install Rock Slope Protection | In District 04 On Route 101 | 03/18/2025 | 1 (03/18/2014) | Details CEM-3701 Report |
