Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214826Project ID: 214826
DEA: 021J5504
EFIS: 0220000090
02-TRI-299-23.1/23.5, 23.1-23.5Major Damage Restoration near BFC slipout 08/27/20201 (03/20/2020)Details CEM-3701 Report
1000455Project ID: 1000455
DEA: 061G6404
EFIS: 0624000204
06-KER-5-8.044/8.455Major Damage Restoration/Scaling/Rock Removal  1 (08/26/2024)Details CEM-3701 Report
1000297Project ID: 1000297
DEA: 010P0704
EFIS: 0124000162
01-MEN-1-82.1/92.9Major items of work include traffic control, reconstruct and stabilize roadway, install micropiles, roadway excavation, repair retaining wall, repair viaduct, restore drainage systems, erosion control and additional work as necessary.In Mendocino Bounty near Rockport from 9 miles South of Juan Creek Bridge to Juan Creek Bridge. 1 (04/25/2024)Details CEM-3701 Report
986Project ID: 986
DEA: 032C8434
03-SAC-5501-0.0/0.0MAJOR RENOVATIONS AND SEISMIC RETROFITS TO MAIN BLDG. 10/19/20101 (11/10/2008)Details CEM-3701 Report
2075Project ID: 2075
DEA: 04264084
EFIS: 0400000734
04-SON-101-2.9 - 0.4MAJOR WIDENING, CONSTRUCT INTERCHANGE AT PETALUMA BLVD - Replace Petaluma River Bridge - Precast Super GirdersPetaluma Blvd.06/08/20201 (01/13/2012)Details CEM-3701 Report
5481Project ID: 5481
DEA: 1003NMC0740
EFIS: 0000001155
Permit Numbers: 1003NMC0740
10-SJ-4-19.8/20Make dedication to accommodate the highway widening due to signalization of State Highway 4 and Stagecoach Road intersection. Work includes the following: construct additional lanes, signing, striping, raised median, and utility pole relocation. UtilityNo data (Data from archives), No data (Data from archives)02/20/2014NOT VERIFIEDDetails CEM-3701 Report
7005Project ID: 7005
DEA: 080F2404
08-RIV-15-R1.0MAKE IMPROVEMENTS TO THE RAINBOW TRUCK INSPECTION FACILITY.RIVERSIDE COUNTY NEAR TEMECULA ABOUT 1.2 MILES NORTH OF THE SAN DIEGO COUNTY LINE AT THE RAINBOW TRUCK INSPECTION FACILITY05/29/20131 (02/13/2012)Details CEM-3701 Report
212994Project ID: 212994
DEA: 051J6204
MINOR: 05A2058
05-SB-101-20.0/20.2Make Temporary roadway repairs to reopen BN traffic. After fire evacuations are lifted, replace damaged pavement and drainage 09/30/20191 (09/30/2019)Details CEM-3701 Report
209458Project ID: 209458
DEA: 043G9804
EFIS: 0413000203
COOP: 042521
04-SCL-82-9.9/25.9make transit and other improvements along a 17.6-mile segment of the El Camino Real corridor in Santa Clara County extending from the Arena in San José to the Palo Alto Transit Center in Palo AltoRoute 82 El Camino Real Bus Rapid Transit (BRT 2 (08/22/2019)Details CEM-3701 Report
889Project ID: 889
EFIS: 0000001155
Permit Numbers: 0310NSN0142
03-SAC-104-1.5/1.5Making intersection at SR 104 and Morega Rd a 3-way stop with advance flashing solar powered beacons in all 3 directions.twin cities Rd(SR 104, Galt09/17/2014NOT VERIFIEDDetails CEM-3701 Report