Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9621-9630 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214826 | Project ID: 214826 DEA: 021J5504 EFIS: 0220000090 | 02-TRI-299-23.1/23.5, 23.1-23.5 | Major Damage Restoration near BFC slipout | 08/27/2020 | 1 (03/20/2020) | Details CEM-3701 Report | |
| 1000455 | Project ID: 1000455 DEA: 061G6404 EFIS: 0624000204 | 06-KER-5-8.044/8.455 | Major Damage Restoration/Scaling/Rock Removal | 1 (08/26/2024) | Details CEM-3701 Report | ||
| 1000297 | Project ID: 1000297 DEA: 010P0704 EFIS: 0124000162 | 01-MEN-1-82.1/92.9 | Major items of work include traffic control, reconstruct and stabilize roadway, install micropiles, roadway excavation, repair retaining wall, repair viaduct, restore drainage systems, erosion control and additional work as necessary. | In Mendocino Bounty near Rockport from 9 miles South of Juan Creek Bridge to Juan Creek Bridge. | 1 (04/25/2024) | Details CEM-3701 Report | |
| 986 | Project ID: 986 DEA: 032C8434 | 03-SAC-5501-0.0/0.0 | MAJOR RENOVATIONS AND SEISMIC RETROFITS TO MAIN BLDG. | 10/19/2010 | 1 (11/10/2008) | Details CEM-3701 Report | |
| 2075 | Project ID: 2075 DEA: 04264084 EFIS: 0400000734 | 04-SON-101-2.9 - 0.4 | MAJOR WIDENING, CONSTRUCT INTERCHANGE AT PETALUMA BLVD - Replace Petaluma River Bridge - Precast Super Girders | Petaluma Blvd. | 06/08/2020 | 1 (01/13/2012) | Details CEM-3701 Report |
| 5481 | Project ID: 5481 DEA: 1003NMC0740 EFIS: 0000001155 Permit Numbers: 1003NMC0740 | 10-SJ-4-19.8/20 | Make dedication to accommodate the highway widening due to signalization of State Highway 4 and Stagecoach Road intersection. Work includes the following: construct additional lanes, signing, striping, raised median, and utility pole relocation. Utility | No data (Data from archives), No data (Data from archives) | 02/20/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 7005 | Project ID: 7005 DEA: 080F2404 | 08-RIV-15-R1.0 | MAKE IMPROVEMENTS TO THE RAINBOW TRUCK INSPECTION FACILITY. | RIVERSIDE COUNTY NEAR TEMECULA ABOUT 1.2 MILES NORTH OF THE SAN DIEGO COUNTY LINE AT THE RAINBOW TRUCK INSPECTION FACILITY | 05/29/2013 | 1 (02/13/2012) | Details CEM-3701 Report |
| 212994 | Project ID: 212994 DEA: 051J6204 MINOR: 05A2058 | 05-SB-101-20.0/20.2 | Make Temporary roadway repairs to reopen BN traffic. After fire evacuations are lifted, replace damaged pavement and drainage | 09/30/2019 | 1 (09/30/2019) | Details CEM-3701 Report | |
| 209458 | Project ID: 209458 DEA: 043G9804 EFIS: 0413000203 COOP: 042521 | 04-SCL-82-9.9/25.9 | make transit and other improvements along a 17.6-mile segment of the El Camino Real corridor in Santa Clara County extending from the Arena in San José to the Palo Alto Transit Center in Palo Alto | Route 82 El Camino Real Bus Rapid Transit (BRT | 2 (08/22/2019) | Details CEM-3701 Report | |
| 889 | Project ID: 889 EFIS: 0000001155 Permit Numbers: 0310NSN0142 | 03-SAC-104-1.5/1.5 | Making intersection at SR 104 and Morega Rd a 3-way stop with advance flashing solar powered beacons in all 3 directions. | twin cities Rd(SR 104, Galt | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report |