Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9601-9610 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7371 | Project ID: 7371 DEA: 010C2004 EFIS: 0112000239 | 01-LAK-53-2.8/7.5 | Storm Water Mitigation | In and near Clearlake from 0.1 south of 40th Avenue/Lakeshore Dr to Rte 20/53 Junction | 01/02/2015 | 1 (04/11/2012) | Details CEM-3701 Report |
| 7563 | Project ID: 7563 DEA: 013633U4 EFIS: 0112000238 | 01-HUM-101-79.9/87.8 | HMA OVERLAY AND RECONSTRUCT MBGR | IN AND NEAR EUREKA AND ARCATA FROM THE EUREKA SLOUGH BRIDGE TO ARCATA OVERHEAD | 01/02/2015 | 1 (09/17/2012) | Details CEM-3701 Report |
| 3841 | Project ID: 3841 DEA: 07172174 | 07-LA-210-R 46.2 | PLANTING AND IRRIGATION | IN AND NEAR LAVERNE AND CLAREMONT FROM SAN DIMAS CANYON ROAD TO 0.2 MILES WEST OF TOWNE AVENUE | 08/12/2010 | 1 (08/12/2010) | Details CEM-3701 Report |
| 210424 | Project ID: 210424 DEA: 080R2204 | 08-SBD-18-T8.3/R17.7 | INSTALL MEDIAN DOUBLE THRIE BEAM BARRIER | IN AND NEAR SAN BERNARDINO FROM SIERRA WAY TO ROUTE 18/138 SEPARATION | 11/29/2016 | 1 (10/15/2015) | Details CEM-3701 Report |
| 3457 | Project ID: 3457 DEA: 06458704 | 06-FRE-99-7.3/11.1 | CONSTRUCT PCCP PANEL REPLACEMENT AND JOINT SEALING (CAPM). | IN AND NEAR SELMA AND FOWLER, FROM 0.6 MILE NORTH OF THE FLORAL AVENUE UNDERCROSSING TO MERCED STREET UNDERCROSSING | 12/13/2012 | 1 (10/25/2010) | Details CEM-3701 Report |
| 5550 | Project ID: 5550 DEA: 100E6124 EFIS: 1000020441 | 10-SJ-99-10.6/14.9 | WIDENING AND OVERLAY EXISTING ROADWAY | IN AND NEAR STOCKTON FROM 0.8 MILE SOUTH OF FRENCH CAMP ROAD UNDERCROSSING TO 0.3 MILE NORTH OF ARCH ROAD UNDERCROSSING | 01/24/2018 | 1 (07/24/2012) | Details CEM-3701 Report |
| 209377 | Project ID: 209377 DEA: 080M9404 EFIS: 0800000506 | 08-SBD-215- | CMSTPLN-6208(018) HOV LANE IN EACH DIRECTION (PSR/PR) | In and near the city of Riverside, from Columbia Avenue to the San Bernardino County line | 2 (06/24/2021) | Details CEM-3701 Report | |
| 208708 | Project ID: 208708 DEA: 060P6604 EFIS: 0612000199 COOP: 061516 | 06-KER-SR223-20.91/21.16 | Bear Mountain Boulevard Streetscape (PPNO 6553) | In Arvin, from Comanche Road to Derby Street in Kern County | 08/25/2021 | 2 (05/08/2013) | Details CEM-3701 Report |
| 209050 | Project ID: 209050 DEA: 032F2304 EFIS: 0312000259 | 03-PLA-49-4.1/4.2 | Construct Modified Chain Link Fence | In Auburn from 0.8 mile north of 80/49 separation to 0.5 mile south of Summer Ridge Dr. | 06/18/2020 | 1 (12/19/2014) | Details CEM-3701 Report |
| 209376 | Project ID: 209376 DEA: 08334714 EFIS: 0800020174 | 08-RIV-110-11.1/11.6 | RAMP/GRADE MODIFICATIONS | IN BANNING AT SUNSET AVE UC | 08/25/2021 | 1 (07/15/2014) | Details CEM-3701 Report |
