Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 9591-9600 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
212692Project ID: 212692
DEA: 09352104
EFIS: 0900020090
09-INY-168,395-17.5/18.3,114.9/116.4CONSTRUCT CONCRETE SIDEWALKS, CURB RAMPS AND DRIVEWAYS.INYO COUNTY IN BISHOP ON ROUTE 168 FROM 0.1 MILE WEST OF PIONEER LANE TO ROUTE 395 AND ON ROUTE 395 FROM 0.1 MILE SOUTH OF JAY STREET TO 0.4 MILE NORTH OF MAC IVER STREET06/23/20211 (05/03/2018)Details CEM-3701 Report
212693Project ID: 212693
DEA: 100G7204
EFIS: 1012000039
10-SJ-4,5-R16.0,25.8/26.2SEISMIC RETROFIT VARIOUS BRIDGES.SAN JOAQUIN COUNTY IN STOCKTON AT ROUTE 5/4 SEPARATION01/24/20201 (01/24/2018)Details CEM-3701 Report
212694Project ID: 212694
DEA: 100P8404
EFIS: 1012000189
10-SJ-4-2.1CONSTRUCT ROCK SLOPE PROTECTION.SAN JOAQUIN COUNTY NEAR DISCOVERY BAY AT 2.3 MILES WEST OF MIDDLE RIVER BRIDGE11/20/2018NOT VERIFIEDDetails CEM-3701 Report
212695Project ID: 212695
DEA: 100Y5504
EFIS: 1013000239
10-SJ-12-17.1/17.7MODIFY CURB RAMPS, SIDEWALKS AND DRIVEWAYS.SAN JOAQUIN COUNTY IN LODI FROM SOUTH SCHOOL STREET TO SOUTH CENTRAL AVENUE.11/21/20181 (02/15/2018)Details CEM-3701 Report
212696Project ID: 212696
DEA: 101C1804
EFIS: 1014000101
10-MER,STA-99-R35.9/R37.3,R0.0/R0.2REPLACE SHOULDER WITH HOT MIX ASPHALT AND REPLACE CONCRETE PAVEMENT.MERCED AND STANISLAUS COUNTIES NEAR TURLOCK FROM 0.3 MILE NORTH OF BRADBURY ROAD OVERCROSSING TO 0.2 MILE NORTH OF STANISLAUS COUNTY LINE01/24/20201 (12/13/2018)Details CEM-3701 Report
212697Project ID: 212697
DEA: 101C3004
EFIS: 1014000145
10-STA,SJ-99-R20.9/R24.7, 0.0/6.8RAMP WIDENING, DRAINAGE, RAMP METERS, AND FIBER OPTIC SYSTEM.STANISLAUS AND SAN JOAQUIN COUNTIES FROM 0.8 MILE SOUTH OF PELANDALE AVENUE OVERCROSSING IN MODESTO TO 0.2 MILE NORTH OF THE NORTH JUNCTION ROUTE 120/99 SEPARATION IN MANTECA01/04/20211 (01/25/2018)Details CEM-3701 Report
212698Project ID: 212698
DEA: 101F6304
EFIS: 1016000090
10-SJ-4-R20.1/29.5COLD PLANE AC PAVEMENT AND RESURFACE PAVEMENT WITH RHMA-G.SAN JOAQUIN COUNTY NEAR STOCKTON FROM ADELBERT AVENUE TO 0.4 MILE WEST OF VAN ALLEN ROAD11/21/2018NOT VERIFIEDDetails CEM-3701 Report
212699Project ID: 212699
DEA: 103A7304
EFIS: 1013000050
10-TUO,STA-108,120-L0.0/L2.8,11.2/T18.2,R0.0/R24.1COLD PLANE AC PAVEMENT AND PLACE RUBBERIZED HOT MIX ASPHALT.TUOLUMNE AND STANISLAUS COUNTIES NEAR SONORA ON ROUTE 108 FROM YOSEMITE JUNCTION TO MONTEZUMA ROAD AND ON ROUTE 120 FROM 0.2 MILE WEST OF LANCASTER ROAD TO MOCCASIN CREEK BRIDGE07/09/20191 (12/13/2018)Details CEM-3701 Report
212700Project ID: 212700
DEA: 11415304
EFIS: 1113000018
11-SD-163-2.5/4.0HFST, ENHANCE STRIPING AND LIGHTING, INSTALL CONCRETE BARRIER AND MGSSAN DIEGO COUNTY IN SAN DIEGO FROM ROBINSON AVENUE OVERCROSSING TO SAN DIEGO RIVER BRIDGE10/02/20191 (02/28/2018)Details CEM-3701 Report
212701Project ID: 212701
DEA: 120M9104
EFIS: 1213000036
12-ORA-90-0.6/8.0REPLACE CURB RAMPS, DRIVEWAYS & SIDEWALKS, MODIFY ELECTRICAL SYSTEMORANGE COUNTY FROM LA HABRA HILLS IN LA HABRA TO ROSE DRIVE IN PLACENTIA01/04/20211 (03/22/2018)Details CEM-3701 Report