Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9581-9590 of 19006 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1566 | Project ID: 1566 EFIS: 0000001155 Permit Numbers: 0408NSN2178 | 04-CC-680-14.5 | Install Video Detection System at the intersection . Install the video detection power/video in existing Traffic signal conduits along with upgrading communication system within the existing Type 332 control cabinet. | 05/04/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 3611 | Project ID: 3611 EFIS: 0000001155 Permit Numbers: 0706NSN0264 | 07-LA-710-T32.247 | INSTALL VIDEO DETECTION AND UPGRADE THE CONTROLLER TYPE 170 IN A NEW TYPE 332 CABINET ON A NEW FOUNDATION | 12/28/2012 | 1 (12/28/2012) | Details CEM-3701 Report | |
| 3975 | Project ID: 3975 DEA: 07226524 | 07-LA-VAR-VAR | INSTALL VERTICAL CLEARANCES AND ADVANCE WARNING SIGNS | 02/09/2012 | 1 (02/09/2012) | Details CEM-3701 Report | |
| 3974 | Project ID: 3974 DEA: 07226514 | 07-LA,VEN-VAR-VAR | Install Vertical Clearance And Warning Signs. | No OSM Involvement Required | 09/15/2011 | 1 (09/15/2011) | Details CEM-3701 Report |
| 3976 | Project ID: 3976 DEA: 07226534 | 07-LA-VAR-VAR | Install Vertical Clearance And Advance Warning Signs. | 06/01/2011 | 1 (07/21/2009) | Details CEM-3701 Report | |
| 3977 | Project ID: 3977 DEA: 07226544 | 07-LA-1-Various | Install Vertical Clearance And Advance Warning Signs. | No OSM Involvement Required | 09/01/2010 | 1 (09/01/2010) | Details CEM-3701 Report |
| 208655 | Project ID: 208655 DEA: 07205514 EFIS: 0712000378 MINOR: 07A3329 | 07-LA-2-13.9 | Install Vehicle spped Feedback Sign, Replace Flashing Beacons, Retrofit soffit Lights, Replace Road Signs and Refress Traffic Stripping | 1 (03/08/2013) | Details CEM-3701 Report | ||
| 163 | Project ID: 163 DEA: 01464604 EFIS: 0100000264 MINOR: 01A1006 | 01-MEN-1-47.4 | INSTALL VEHICLE SPEED FEEDBACK SYSTEM AND CONSTRUCT A MAINT. VEHICLE PULLOFF NEAR LITTLE RIVER ON RTE1 | 01/24/2013 | 1 (01/24/2013) | Details CEM-3701 Report | |
| 4116 | Project ID: 4116 DEA: 072P5504 MINOR: 07A2419 | 07-VEN-118-4.9/14.2 | INSTALL VEHICLE SPEED FEEDBACK SIGNS AND FLASHING BEACONS ON RTE 118 | 05/21/2012 | NOT VERIFIED | Details CEM-3701 Report | |
| 5430 | Project ID: 5430 DEA: 09341504 EFIS: 0900000132 MINOR: 09A0406 | 09-MON-395-118.9/119.3 | INSTALL VEHICLE SPEED FEEDBACK SIGNS | 12/23/2024 | 2 (06/24/2021) | Details CEM-3701 Report |
