Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9581-9590 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 994117 | Project ID: 994117 DEA: 010L4704 EFIS: 0122000016 | 01-HUM-96-12.4/12.7 | HOOPA DOWNTOWN BEAUTIFICATION | HUMBOLDT COUNTY NEAR HOOPA FROM TISH TANG ROAD TO 0.2 MILE EAST OF POST OFFICE ROAD | 01/22/2024 | 1 (01/10/2023) | Details CEM-3701 Report |
| 215622 | Project ID: 215622 DEA: 010K4304 EFIS: 0120000089 | 01-HUM-96-16.8/23.1 | REPLACE AC SURFACE WITH PRECOATED AGGREGATE AND MICRO SURFACING. | HUMBOLDT COUNTY NEAR HOOPA FROM ROCK CHUTE VIADUCT TO KLAMATH RIVER BRIDGE | 10/04/2022 | 1 (04/07/2021) | Details CEM-3701 Report |
| 208717 | Project ID: 208717 DEA: 010C7304 EFIS: 0113000038 | 01-HUM-96-R13.3/16.8 | COLD IN PLACE RECYCLE W/HMA OVERLAY | HUMBOLDT COUNTY NEAR HOOPA FROM HOSTLER CREEK BRIDGE TO ROCK CHUTE VIADUCT | 01/30/2015 | 2 (06/26/2013) | Details CEM-3701 Report |
| 210330 | Project ID: 210330 DEA: 010C9404 EFIS: 0113000080 | 01-HUM-96-3.7/11.6 | AR CHIP SEAL | HUMBOLDT COUNTY NEAR HOOPA FROM 4.3 MILES WEST OF TISH TANG CAMPGROUND TO SUPPLY CREEK BRIDGE | 06/29/2018 | 1 (09/23/2015) | Details CEM-3701 Report |
| 210443 | Project ID: 210443 DEA: 010E2904 EFIS: 0114000075 | 01-HUM-101-R10.2/R11.4,R22.5/25.5 | HMA OVERLAY | HUMBOLDT COUNTY NEAR GARBERVILLE FROM 1.0 MILE SOUTH OF SPROWEL CREEK ROAD OVERCROSSING TO 0.1 MILE SOUTH OF REDWOOD DRIVE OVERCROSSING AND NEAR MIRANDA FROM FRENCH ROAD UNDERCROSSING TO 0.5 MILE NORTH OF SALMON CREEK ROAD OVERCROSSING | 06/29/2018 | 1 (09/23/2015) | Details CEM-3701 Report |
| 1001608 | Project ID: 1001608 DEA: 01464804 EFIS: 0100000266 | 01-HUM-101-1.1/2.5 | INSTALL SOLDIER PILE WALL, AND REMOVE AND REPLACE ROADWAY SECTION. | HUMBOLDT COUNTY NEAR GARBERVILLE FROM 0.5 MILE SOUTH TO 0.9 MILE NORTH OF RICHARDSON GROVE UNDERCROSSING | 1 (09/19/2025) | Details CEM-3701 Report | |
| 208684 | Project ID: 208684 DEA: 010A1504 EFIS: 0100020020 | 01-HUM-211-R74.4/79.2 | RUBBERIZED HOT MIX ASPHALT | HUMBOLDT COUNTY NEAR FERNDALE FROM 0.2 MILE SOUTH OF SALT RIVER OVERFLOW TO ROUTE 101 | 01/30/2015 | 1 (04/04/2013) | Details CEM-3701 Report |
| 215741 | Project ID: 215741 DEA: 01366004 EFIS: 0100000127 | 01-HUM-101-80.0/84.0 | Indianola Cutoff UC | HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF | 1 (05/17/2021) | Details CEM-3701 Report | |
| 7037 | Project ID: 7037 DEA: 010A2104 EFIS: 0100020026 | 01-HUM-101-69.9/74.8 | REPLACE AC SURFACING | HUMBOLDT COUNTY NEAR EUREKA FROM 0.7 MILE SOUTH OF FIELDS LANDING OVERHEAD TO HERRICK AVENUE OVERCROSSING | 09/04/2012 | 1 (06/25/2012) | Details CEM-3701 Report |
| 214512 | Project ID: 214512 DEA: 010F2204 EFIS: 0115000092 | 01-HUM-101-80.1/84.3 | ROADWAY EXCAVATION, PLACE HMA AND AB. | HUMBOLDT COUNTY NEAR EUREKA AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF COLE AVENUE TO 0.4 MILE NORTH OF BAYSIDE CUTOFF | 03/09/2022 | 1 (11/13/2019) | Details CEM-3701 Report |
