Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 9561-9570 of 19663 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
3340Project ID: 3340
DEA: 060L6204
06-FRE-99-R4.9REPAIR AND RELINE CULVERTFRESNO COUNTY IN SELMA AT MCCALL AVENUE UNDERCROSSING12/30/20111 (04/25/2011)Details CEM-3701 Report
1002089Project ID: 1002089
DEA: 061J3404
EFIS: 0626000068
MINOR: 06A3234
06-FRE-99-7.28/7.28Remove and replace existing electrical sign (fog system sign F29) and install conductors, wiring, camera pole, controller cabinet, traffic control, and portions of the existing guardrailFresno County in the City of Selma along SB SR 99 at PM 7.28 1 (04/14/2026)Details CEM-3701 Report
994111Project ID: 994111
DEA: 061E2104
EFIS: 0621000226
06-FRE-5-8.0REPLACE JOINT SEALS, PREPARE AND PLACE POLYESTER CONCRETE OVERLAY.FRESNO COUNTY NEAR AVENAL AT ARROYO PASAJERO BRIDGE08/23/20231 (07/14/2022)Details CEM-3701 Report
213103Project ID: 213103
DEA: 060V5004
EFIS: 0616000161
06-FRE-5-0.0/10.0DIGOUTS AND RUBBERIZED BONDED WEARING COURSE TYPE O RESURFACING.FRESNO COUNTY NEAR AVENAL FROM FRESNO/KINGS COUNTY LINE TO 0.9 MILE SOUTH OF EL DORADO AVENUE12/07/2018NOT VERIFIEDDetails CEM-3701 Report
212932Project ID: 212932
DEA: 060V2304
EFIS: 0617000173
06-FRE-168-R11.8/18.5RHMA RESURFACINGFRESNO COUNTY NEAR CLOVIS FROM SHEPHERD AVENUE TO SAMPLE ROAD12/07/2018NOT VERIFIEDDetails CEM-3701 Report
7500Project ID: 7500
DEA: 060H9404
EFIS: 0600000150
06-FRE-168-R14.4/R15.0REALIGNMENT HORIZONTAL CURVEFRESNO COUNTY NEAR CLOVIS, FROM 0.4 MILE WEST OF SHEPHERD AVENUE TO 0.3 MILE EAST OF SHEPHERD AVENUE02/04/20131 (10/10/2012)Details CEM-3701 Report
213029Project ID: 213029
DEA: 060W7304
EFIS: 0617000276
06-FRE-198-3.3/21.2HMA RESURFACING, REPAIR FAILED AREAS, AND MGS REPLACEMENT.FRESNO COUNTY NEAR COALINGA AT VARIOUS LOCATIONS FROM FRAME LANE TO FIRESTONE AVENUE12/07/2018NOT VERIFIEDDetails CEM-3701 Report
209947Project ID: 209947
DEA: 06432604
EFIS: 0600020388
06-FRE-33-10.9/11.1REPLACE BRIDGE, RECONSTRUCT ROADWAY, AND INSTALL RSP.FRESNO COUNTY NEAR COALINGA FROM 0.1 MILE WEST TO 0.1 MILE EAST OF JACALITOS CREEK BRIDGE02/17/20171 (12/29/2014)Details CEM-3701 Report
215630Project ID: 215630
DEA: 061A5304
EFIS: 0620000052
06-FRE-198-26.3/26.8COLD PLANE PAVEMENT, RESURFACE WITH HMA AND MODIFY SIGNAL.FRESNO COUNTY NEAR COALINGA FROM 0.5 MILE WEST OF ROUTE 5 TO ROUTE 198/5 SEPARATION03/02/20221 (03/29/2021)Details CEM-3701 Report
211316Project ID: 211316
DEA: 060T6504
EFIS: 0615000220
06-FRE-5-10.0/20.0RUBBERIZED-HMA RESURFACING, REPAIR FAILED AREAS AND PANEL REPLACEMENT.FRESNO COUNTY NEAR COALINGA FROM 0.8 MILE NORTH OF GALE AVENUE UNDERCROSSING TO 1.0 MILE SOUTH OF TOULUMNE AVENUE OVERCROSSING08/30/20171 (10/04/2016)Details CEM-3701 Report