Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9531-9540 of 19352 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210420 | Project ID: 210420 DEA: 040G0504 EFIS: 0400000305 COOP: 042570 | 04-SOL-12-24.2/25.3 | SR-12 safety and operational improvements with realignment of Church Road or Amerada Road. | At Church Road and Amerada Road intersection | 01/09/2025 | 2 (08/19/2019) | Details CEM-3701 Report |
| 210422 | Project ID: 210422 DEA: 07297604 EFIS: 0713000212 | 07-LA-27-13.3/13.7 | Westfield West Valley Offsite Improvements | SR 27 Topanga Canyon Boulevard Widening | 08/17/2021 | 2 (10/01/2014) | Details CEM-3701 Report |
| 210423 | Project ID: 210423 DEA: 100T6304 EFIS: 1000000290 COOP: 100486 Permit Numbers: 1018NSN0664 | 10-AMA-88,12-VAR | Buena Vista Tribe of the Me-Wuk Indian Reservation ; Construction of signal and associated lane improvements and lane improvements at the intersection of Rte 88 and Rte 12 in San Joaquin | At the intersect of State Route 88 and Liberty Road/Comanche parkway and the intersection of Rte. 88 and Buena Vista Rd in Amador County | 02/10/2021 | 2 (09/23/2019) | Details CEM-3701 Report |
| 210849 | Project ID: 210849 Permit Numbers: 0413NMC0323 0415NRW1709 | 04-SCL-82-12.8/12.8 | Relocate medians,new HMA pavement,microsurface,restripe. | Intersection @ San Tomas Expressway, Santa Clara | 08/22/2018 | 1 (09/16/2015) | Details CEM-3701 Report |
| 210424 | Project ID: 210424 DEA: 080R2204 | 08-SBD-18-T8.3/R17.7 | INSTALL MEDIAN DOUBLE THRIE BEAM BARRIER | IN AND NEAR SAN BERNARDINO FROM SIERRA WAY TO ROUTE 18/138 SEPARATION | 11/29/2016 | 1 (10/15/2015) | Details CEM-3701 Report |
| 210429 | Project ID: 210429 DEA: 044J1604 EFIS: 0415000273 | 04-CC-80-8.7, 8.699999999999999 | Reconstruct slope with rock slope protection and light weight cellular concrete, install drainage | In Pinole at 0.2 mile east of Pinole Valley Road | 01/08/2016 | 1 (09/17/2015) | Details CEM-3701 Report |
| 210427 | Project ID: 210427 Permit Numbers: 02136SN0227 02146RW0296 | 02-TEH-5-24.35/25.35 | Construct roadway improvements to the South Main Street Interchange in South Red Bluff in accordance with approved, signed and stamped plans (dated 5/31/2014), project special provisions, and all approved addendums for improvements associated with Wal-Mart Store No. 1608-02, including modification | South Main Street, Red Bluff | 12/31/2016 | 2 (09/23/2015) | Details CEM-3701 Report |
| 210428 | Project ID: 210428 Permit Numbers: 0416NMC1306 0416NRW2203 | 04-SCL-680-1.74/1.74 | Remove existing PCC and AC raised median with curb. | Alum Rock Ave, San Jose | 08/22/2018 | 1 (06/15/2015) | Details CEM-3701 Report |
| 210431 | Project ID: 210431 DEA: 07299204 EFIS: 0713000307 Permit Numbers: 0715AMC0733 | 07-LA-101-9.3/10.2 | 3 Retaining Walls (1 Type 1 & 2 MSE Walls) | Along Route 101 between Bennett Drive and Regal Place, in the city of Los Angeles | 05/23/2016 | 2 (05/06/2015) | Details CEM-3701 Report |
| 210432 | Project ID: 210432 Permit Numbers: 04156DP0639 0412NSN2041 | 04-CC-24-2.31/2.31 | The project will upgrade traffic signals to provide enhanced signal head placement for improved visibility,install/update signage for enhanced route guidance,and install bike route with shared lane arrows. | Camino Pablo (between Snata Maria Way & Brookwood Road), Orinda | 09/14/2018 | 1 (05/12/2015) | Details CEM-3701 Report |
