Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9531-9540 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210186 | Project ID: 210186 Permit Numbers: 08116MC0377 | 08--- | 2 (01/29/2015) | Details CEM-3701 Report | |||
| 210183 | Project ID: 210183 Permit Numbers: 04146DP2269 0413NMC2337 | 04-SM-101-3.5/3.5 | The proposed project will include widening the northbound off-ramp on the western side of the approach to accommodate an additional right-turn lane. | Route 101, Menlo Park | 09/14/2018 | 1 (02/06/2015) | Details CEM-3701 Report |
| 210182 | Project ID: 210182 DEA: 073P8704 | 07-LA-105-R6.0/R6.5 | Highway Planting Restoration | 1 (09/10/2018) | Details CEM-3701 Report | ||
| 210181 | Project ID: 210181 DEA: 010F0504 EFIS: 0115000061 | 01-MEN-1,001-37.3/40.53 | Repair drainage and slipouts | In Men County near Elk at 1.6 miles south of Navarro Bluff Road and at 0.3 mile north of RTE 128 | 08/27/2018 | 2 (01/30/2015) | Details CEM-3701 Report |
| 210180 | Project ID: 210180 DEA: 101C9004 EFIS: 1014000185 | 10-STA-5,27-41.0/51.0 | REPAIR FAILED AREAS AND RUBBERIZED HMA RESURFACING. | STANLISLAUS COUNTY AT AND NEAR LA GRANGE FROM 2.2 MILES EAST OF TOULUMNE RESORT RIGHT TO TOULUMNE COUNTY LINE. | 11/14/2016 | 2 (01/30/2015) | Details CEM-3701 Report |
| 210179 | Project ID: 210179 DEA: 100Y9404 | 10-AMA-88-38.0/46.9 | RUBBERIZED-HMA RESURFACING, LOCALIZED DIGOUTS, AND DIKE REPLACEMENT. | AMADOR COUNTY ABOUT 8 MILES WEST OF PIONEER FROM 0.2 MILE WEST OF SHAKE RIDGE ROAD TO 0.9 MILE EAST OF CAT CREEK ROAD | 11/07/2016 | 2 (01/30/2015) | Details CEM-3701 Report |
| 210178 | Project ID: 210178 DEA: 081C9004 EFIS: 0813000074 | 08-RIV,SBD-15,60,138&215-Varies | BRIDGE REHAB, AND REPAIR APPROACH SLAB | RIVERSIDE AND SAN BERNARDINO COUNTIES 0N ROUTE 15, 60, 138 AND 215 AT VARIOUS LOCATIONS | 12/07/2015 | 1 (05/13/2015) | Details CEM-3701 Report |
| 210177 | Project ID: 210177 DEA: 060S1904 EFIS: 0614000118 | 06-TUL-198-R3.8/6.7 | CONSTRUCT INDIVIDUAL SLAB REPLACEMENT. | TULARE COUNTY IN VISALIA FROM 0.1 MILE EAST OF ROUTE 99/198 SEPARATION TO AKERS STREET UNDERCROSSING | 02/23/2016 | 1 (02/05/2015) | Details CEM-3701 Report |
| 210176 | Project ID: 210176 DEA: 034F7004 EFIS: 0314000243 | 03-PLA-80-31.8 | INCREASE ON AND OFF-RAMP RADIUS AND LANE WIDTH OF ILLINOISTOWN OC. | PLACER COUNTY NEAR COLFAX AT ILLINOISTOWN OVERCROSSING | 02/23/2016 | 1 (02/05/2015) | Details CEM-3701 Report |
| 210175 | Project ID: 210175 DEA: 024G3404 EFIS: 0213000107 | 02-MOD-299-14.7/20.0 | COLD IN-PLACE RECYCLE AND PLACE HMA | MODOC COUNTY NEAR CANBY FROM 3.3 MILES WEST TO 2.1 MILES EAST OF PIT RIVER BRIDGE | 02/23/2016 | 1 (01/30/2015) | Details CEM-3701 Report |
