Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9491-9500 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1000127 | Project ID: 1000127 DEA: 030N4704 EFIS: 0324000119 | 03-BUT-99-36.305 | Eaton Road OC high-load hit | Hwy99 @ Eaton Rd. | 05/08/2024 | 1 (05/08/2024) | Details CEM-3701 Report |
| 209198 | Project ID: 209198 DEA: 031F0904 EFIS: 0300001097 Permit Numbers: 0313NMC0253 | 03-SAC-104-0.0/0.1 | Construct roundabouts at SR 99 and Twin Cities Rd (Sr-104) interchanges and W and E Stockton Blvd. CT PE is Jess Avila | Hwy 99, Galt | 07/12/2019 | 2 (11/12/2013) | Details CEM-3701 Report |
| 214700 | Project ID: 214700 DEA: 030F2804 EFIS: 0312000069 | 03-SAC-99-7.1/9.4 | Dillard Overcrossing and McConnel Overhead | Hwy 99, Elk Grove, CA | 08/21/2023 | 1 (04/20/2020) | Details CEM-3701 Report |
| 5492 | Project ID: 5492 DEA: 10937700 EFIS: 0000001155 Permit Numbers: 10056MC0696 10066DP0380 10066DP0359 10086RW0236 | 10-SJ-99-24.026/24.104 | Improve existing State Route 99 west frontage road intersection at Morada Lane. It was discovered that the Permittee removed a number of existing Oak Trees within the State R/W from the Northwest corner of Frontage Road and Morada Lane. Alex has all the p | Hwy 99 Frontage and Morada Lane, Stockton | 02/20/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 7675 | Project ID: 7675 EFIS: 0000001155 Permit Numbers: 0311NRD0671 0312NRW0036 0313NRT0058 03136RT0072 0308NSN1030 03126DP0736 | 03-SUT--40/40.06 | Install New Traffic Signal | Hwy 99 and Elm Street, Live Oak | 02/06/2015 | 1 (12/18/2012) | Details CEM-3701 Report |
| 209159 | Project ID: 209159 Permit Numbers: 0412NMC1030 | 04-SCL-9-11.15/11.15 | Work includes widening HWY 9 AND University, and traffic signal modifications. | HWY 9, Town of Los Gatos | 10/21/2014 | 1 (10/17/2013) | Details CEM-3701 Report |
| 212383 | Project ID: 212383 Permit Numbers: 0414NMC0120 04166RT0398 0417NRT0222 04176DP0198 0417NRD0267 04166RT0398 | 04-SCL-9-8.8/10.3 | The project proposes to construct an ADA compliant asphalt concrete pedestrian path at locations along HWY 9 to enhance pedestrian travel and safety. | HWY 9, Saratoga | 02/03/2020 | 1 (05/09/2017) | Details CEM-3701 Report |
| 6895 | Project ID: 6895 EFIS: 0000001155 Permit Numbers: 05116DP0559 | 05-SCR-9-5.6/5.6 | provide traffic control for County road maintenance at San Lorenzo Avenue | Hwy 9, Felton | 09/18/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 214039 | Project ID: 214039 Permit Numbers: 04186UL1291 04186RW1999 | 04---3.1/4.43 | PG&E is in the process of designing a replacement and modernization of the gas transmission system on L-107 in Fremont. | Hwy 880, Fremont | 11/30/00-1 | 1 (09/16/2019) | Details CEM-3701 Report |
| 212417 | Project ID: 212417 DEA: 040P4904 EFIS: 0417000452 | 04-SM-84-16.3/17.6 | Construct soldier pile walls with ground anchors | Hwy 84 multiple locations between PM 16.3-17.6 | 12/17/2019 | 1 (09/08/2017) | Details CEM-3701 Report |
