Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9481-9490 of 19663 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 994942 | Project ID: 994942 DEA: 061E7104 EFIS: 0622000091 | 06-FRE-33,180-Various | PLANTING, IRRIGATION WORK AND MINOR HOT MIX ASPHALT PAVING. | FRESNO COUNTY AT VARIOUS LOCATIONS | 08/31/2026 | 1 (07/26/2023) | Details CEM-3701 Report |
| 995238 | Project ID: 995238 DEA: 060W9704 EFIS: 0617000292 | 06-FRE-41,99,180-var | PLANTING, MAINTAINING EXISTING PLANTING AREA, AND RECYCLED WATER. | FRESNO COUNTY AT VARIOUS LOCATIONS | 1 (07/23/2024) | Details CEM-3701 Report | |
| 995446 | Project ID: 995446 DEA: 060X0604 EFIS: 0618000015 | 06-FRE-198-0.5/19.5 | REMOVE AND REPLACE CULVERTS AND CURED IN PLACE PIPELINER. | FRESNO COUNTY AT VARIOUS LOCATIONS FROM 1.3 MILES WEST OF WARTHAN CREEK OVERCROSSING TO 1.7 MILES WEST OF FIRESTONE AVENUE | 1 (11/16/2023) | Details CEM-3701 Report | |
| 213876 | Project ID: 213876 DEA: 060X7304 EFIS: 0618000125 | 06-FRE-33-26.6/R28.7,41.4/52.4 | REPLACE AND REPAIR EXISTING DRAINAGE SYSTEMS. | FRESNO COUNTY AT VARIOUS LOCATIONS FROM 2.3 MILES NORTH OF JUNCTION ROUTE 198 TO 1.7 MILES NORTH OF DERRICK AVENUE AND FROM 1.1 MILES NORTH OF HARLAN AVENUE TO 1.0 MILE NORTH OF MANNING AVENUE. | 09/04/2019 | 1 (04/11/2019) | Details CEM-3701 Report |
| 209128 | Project ID: 209128 EFIS: 0613000160 | 06-FRE-168-L32.5/R36.2 | CURED-IN-PLACE PIPELINER. | FRESNO COUNTY AT VARIOUS LOCATIONS FROM 3.7 MILES WEST OF TOLLHOUSE ROAD/ AUBERRY ROAD TO TOLLHOUSE ROAD/ AUBERRY ROAD | 01/23/2015 | 1 (12/19/2014) | Details CEM-3701 Report |
| 212167 | Project ID: 212167 DEA: 060V3104 EFIS: 0616000130 | 06-FRE-198-0.0/42.7 | CONSTRUCT RUMBLE STRIP AND REPLACE PAVEMENT DELINEATION. | FRESNO COUNTY AT VARIOUS LOCATIONS FROM MONTEREY COUNTY LINE TO KINGS COUNTY LINE | 10/10/2017 | 1 (10/10/2017) | Details CEM-3701 Report |
| 995244 | Project ID: 995244 DEA: 061A4604 EFIS: 0620000037 | 06-FRE-180-89.6/90.7 | HMA (TYPE A), HMA-OGFC, CL2 AGGREGATE BASE AND ROADWAY EXCAVATION. | FRESNO COUNTY AT YOKUTS VALLEY FROM 0.2 MILE EAST OF GEORGE SMITH ROAD TO ELWOOD ROAD. | 07/11/2025 | 1 (04/03/2024) | Details CEM-3701 Report |
| 215412 | Project ID: 215412 DEA: 061A9404 EFIS: 0620000141 | 06-FRE-5-20.0/21.0,30.9/37.3 | COLD PLANE AND REPLACE WITH RHMA (TYPE O). | FRESNO COUNTY FROM 2 MILES NORTH OF ROUTE 5/33/145 SEPARATION TO SOUTH DERRIC AVENUE OVERCROSSING AND FROM 1 MILE NORTH OF ROUTE 5/33 SEPARATION TO 1.1 MILES SOUTH OF KAMM AVENUE OVERCROSSING | 11/23/2021 | 1 (01/25/2021) | Details CEM-3701 Report |
| 214946 | Project ID: 214946 DEA: 060X1504 EFIS: 0618000233 | 06-FRE-99-0.9/30.5 | POLYESTER CONCRETE OVERLAY. | FRESNO COUNTY FROM CONEJO AVENUE UNDERCROSSING TO GRANTLAND AVENUE UNDERCROSSING | 01/26/2021 | 1 (05/21/2020) | Details CEM-3701 Report |
| 1001646 | Project ID: 1001646 DEA: 060X2204 EFIS: 0618000041 | 06-FRE-168-R8.1/45.8 | RCP CULVERTS, CIPP, STRUCTURAL CONCRETE (DI), AND HMA (TYPE A). | FRESNO COUNTY IN AND NEAR CLOVIS AT VARIOUS LOCATIONS FROM 0.1 MILE EAST OF FOWLER AVENUE OVERCROSSING TO 0.1 MILE EAST OF WARBLER LANE | 1 (10/06/2025) | Details CEM-3701 Report |
